Sails and Rigging
12.6
12.5 Reefing Instructions
1. Run both reefing lines as illustrated in the boom &
reef layout. The shorter reef line will be used on the first
reef (Starboard Side, Green). The longer reef line on the
second reef (Port Side, Red).
2. Raise the main sail.
3. Ease the mainsheet and vang.
4. Lower the main sail to approximately the first reef
position.
5. Take up the slack in the first reef line until the tack and
the clew are down to about 2” above the boom.
6. Adjust the main halyard so that the tack reef point is
not contacting the goose neck on the front of the spar
and is applying tension to the luff of the main above the
reef, not below. There will be approximately 6” (150mm)
of stretch in the main luff and main halyard when the reef-
ing line is tensioned, so, make sure that this is allowed
for when adjusting the main halyard to locate the tack
reef block.
7. Confirm that the tack reef point is still clear of the tack
shackle and that only the main luff above the reef cringle
is tensioned, not the luff between the cringle and the top
stacked sail slide. Ease the reef line and readjust the
halyard if necessary.
8. Mark the halyard at the stopper with 1” (25mm) single
band of indelible marker ink. By dropping the halyard to
this mark every time, positioning is made easier. The hal-
yard is automatically in the correct position for the reef.
9. Repeat the procedure for the second reef, using double
bands to mark the halyard in the correct position.
12.6 Reefing Procedure
1. Head up into the wind.
2. Ease the mainsheet and vang.
3. Check the topping lift for adequate boom support.
4. Lower the main halyard to the appropriate mark and
snub the line with the stopper.
5. Tension the reefing line with the self-tailing winch until
the reef clew is brought down to the boom. Apply stopper
and tension the main halyard back up, ease the topping
lift (if needed).
12.7 Shaking Out a Reef
1. Head up into the wind.
2. Ease the mainsheet and vang. Release the tension on
the topping. Lift (if needed).
3. Release the line stopper and remove reef line from
winch.
4. Tension the main halyard to raise sail, making sure reef
lines run freely while sail is being raised. Apply stopper
to main halyard.
5. Re-tension vang and mainsheet, ease the topping lift
(if needed).
12.8 Spinnaker (Optional)
To set the optional spinnaker using the dedicated halyard,
first attach the halyard to the head ring on the sail. Next,
tie the tack downhaul line to the tack ring, lead it through a
turning block on the deck near the bow, and run it aft to the
cockpit. Set up the tack downhaul so the tack of the sail is
about five inches above the deck when the sail is hoisted.
Attach the spinnaker sheet to the clew ring of the spinna-
ker and make sure the line is led aft outside the lifelines
to a turning block on the toerail located just forward of
the stern pulpit. Then run it forward to a winch allowing
total slack in the sheet. The sheet that is not being used
— the lazy sheet — should also be attached to the clew
of the spinnaker , led forward
in front of the headstay
,
and then back on the other side of the boat — outside
the shrouds and lifelines — to another turning block
positioned just forward of the stern pulpit. Then take that
sheet and lead it to a winch, with the slack in the sheet.
Now you are ready to hoist the spinnaker. Start by
heading off to a square run. Leave the mainsail fully
out during the hoisting procedure as it will blanket
the spinnaker and keep it from filling until you are
ready for it to be set. A good place to raise the sail
is from the leeward side, just ahead of the boom.
main and jib halyard you will find a main sheet line with
a winch at the aft edge of the cockpit together with the
vang and or outhaul control (some optional). The jib is
controlled with the jib sheet control lines lead back to the
cockpit coming either side. In addition the jib furling line
located to the starboard side of the cockpit allows the
safe and easy unfurling and furling in of the jib sail.
Summary of Contents for H39
Page 1: ...H39 V2 062012 P N 1035787 Operator s Manual ...
Page 2: ......
Page 9: ...Introduction H39 Chapter 1 DC 062012 P N 1035787 ...
Page 14: ...Notes Introduction 1 6 ...
Page 15: ...V2 062012 P N 1035787 Documents Forms H39 Chapter 2 and ...
Page 26: ...Documents and Forms Maintenance Log Date Maintenance Performed Hourmeter 2 12 ...
Page 27: ...Documents and Forms 2 13 Date Maintenance Performed Hourmeter Maintenance Log ...
Page 30: ...Documents and Forms Power Squadron recommendations for maintenance and safe boating 2 16 ...
Page 33: ...Documents and Forms 2 19 Spare Parts List ...
Page 34: ...Documents and Forms Dates of practice drills and onboard safety inspections 2 20 ...
Page 35: ...Documents and Forms 2 21 My personal preferences for maintenance items safety gear ...
Page 36: ...Documents and Forms Notes 2 22 ...
Page 37: ...V2 062012 P N 1035787 Limited Warranty H39 Chapter 3 ...
Page 38: ...This Page Intentionally Left Blank Hunter Limited Warranty 3 2 ...
Page 47: ...V2 062012 P N 1035787 Boating Safety H39 Chapter 4 ...
Page 66: ...Boating Safety 4 20 Notes ...
Page 69: ...V2 062012 P N 1035787 Fuel Systems H39 Chapter 5 ...
Page 75: ...Fig 5 7 A Quick Fuel Filter Reference Fuel Systems 5 7 ...
Page 80: ...Notes Fuel Systems 5 12 ...
Page 82: ...This Page Intentionally Left Blank Fuel Systems 5 14 ...
Page 84: ...This Page Intentionally Left Blank Fuel Systems 5 16 ...
Page 85: ...V2 062012 P N 1035787 Underwater Gear H39 Chapter 6 ...
Page 92: ...Underwater Gear 6 8 Notes ...
Page 94: ...Underwater Gear 6 10 This Page Intentionally Left Blank ...
Page 96: ...Underwater Gear 6 12 This Page Intentionally Left Blank ...
Page 98: ...Underwater Gear 6 14 This Page Intentionally Left Blank ...
Page 99: ...V2 062012 P N 1035787 DC Electric Systems H39 Chapter 7 ...
Page 108: ...DC Electric Systems 7 10 Notes ...
Page 110: ...DC Electric Systems 7 12 This Page Intentionally Left Blank ...
Page 112: ...DC Electric Systems 7 14 This Page Intentionally Left Blank ...
Page 113: ...V2 062012 P N 1035787 AC Electric Systems H39 Chapter 8 ...
Page 120: ...AC Electric Systems 8 8 Notes ...
Page 122: ...AC Electric Systems 8 10 This Intentionally Left Blank ...
Page 124: ...AC Electric Systems 8 12 This Intentionally Left Blank ...
Page 126: ...AC Electric Systems 8 14 This Intentionally Left Blank ...
Page 127: ...V2 062012 P N 1035787 Water Systems H39 Chapter 9 ...
Page 134: ...Water Systems 9 8 This Page Intentionally Left Blank ...
Page 136: ...Water Systems 9 10 This Page Intentionally Left Blank ...
Page 138: ...Water Systems 9 12 This Page Intentionally Left Blank ...
Page 139: ...V2 062012 P N 1035787 Waste Systems H39 Chapter 10 ...
Page 148: ...Waste and Sanitation Systems 10 10 This Page Intentionally Left Blank ...
Page 150: ...Waste and Sanitation Systems 10 12 This Page Intentionally Left Blank ...
Page 152: ...Waste and Sanitation Systems 10 14 This Page Intentionally Left Blank ...
Page 154: ...Waste and Sanitation Systems 10 16 This Page Intentionally Left Blank ...
Page 155: ...Waste and Sanitation Systems 10 17 Notes ...
Page 156: ...Waste and Sanitation Systems 10 18 Notes ...
Page 157: ...V2 062012 P N 1035787 Engines Transmissions H39 Chapter 11 and ...
Page 166: ...Engines and Transmissions 11 10 This Page Intentionally Left Blank ...
Page 167: ...V2 062012 P N 1035787 Sails Rigging H39 Chapter 12 and ...
Page 177: ...Sails and Rigging 12 11 Figure 12 10 Conventional Standing Rigging ...
Page 179: ...Sails and Rigging 12 13 Figure 12 11 Furling Standing Rigging ...
Page 185: ...Sails and Rigging 12 19 Notes ...
Page 186: ...Sails and Rigging 12 20 This Page Intentionally Left Blank ...
Page 187: ...Getting Underway H39 Chapter 13 V2 062012 P N 1035787 DC 041709 P N 1035787 ...
Page 194: ...Getting Underway 13 8 Notes ...
Page 195: ...V2 062012 P N 1035787 Maintenance H39 Chapter 14 ...
Page 208: ...Maintenance 14 14 This Page Intentionally Left Blank ...
Page 209: ...V2 062098 P N 1035787 Glossary H39 Chapter 15 ...
Page 215: ...Notes Glossary 15 7 ...
Page 216: ...Notes Glossary 15 8 ...