Page 27
STEP 6 - ONCE THE FIRST CHANNEL IS FIXED INTO POSITION MOVE TO THE CHANNEL ON THE
OTHER SIDE.
1. Again, start at the bottom cut out
and drill the 2.5mm pilot hole and
fix off the guide with the supplied
fastener.
2. Then unlike the other side move the bottom rail up to the next cut out
and drill and secure the guide as above, ensuring only small tensioning
pressure is applied to the channel / guide. Repeat this until the guide is
secure at each cut out.
NB. Do not raise the
blind while screw fixing
the floating guide on
this side.
2.5mm Pilot
drill and screw
to secure then
repeat on the
next top cut out.
Raise the blind and align
the bottom rail onto the
next cut out. Apply light
tension and 2.5mm pilot
drill & screw to the side
channel.
ALPHA
AWNING SERIES INSTALLATION MANUAL
Summary of Contents for ALPHA Series
Page 1: ...11 2019 ALPHA AWNING SERIES INSTALLATION AND MEASURING GUIDELINES INCLUDES THE SRS V2 ...
Page 51: ...Page 49 ...
Page 52: ......