Hunt sime 30e Installation Instructions Manual Download Page 31

means there is a breakdown in the flame
detection  circuit;  the  boiler  will  stop  and
the display will show anomaly “AL 08”.

AU X I L I A RY  S E N S O R  E R R O R
ALARM 10 

ONLY  FOR  BOILER  WITH  SOLAR  PLANT
COUPLING (

PAR 2 = 10 or 14

): 

D.H.W.  inlet  probe  anomaly.  When  the
probe is open or short circuited the boi-
ler  looses  the  solar  function  and  the
display shows anomaly AL 10. 

MODULATOR ERROR ALARM 11 

The modulator is not connected. 
When  during  functioning  t he  boiler
detects  zero  current  to  the  modulator,
the display will show anomaly “AL 11”.

The  boiler  will  function  at  minimum
power  and  the  anomaly  will  be  de-acti-
vated when the modulator is reconnec-
ted or when the burner stops working.

CONFIGURATION  ERROR ALARM  12

Anomaly  in  the  SEALED/OPEN  configu-
ration.  There  may  be  a  conflict  between
the values set by the installer for PAR 1
and the self-detection carried out by the
card  causes  the  activation  of  the  alarm:
the boiler will not function and the display
will show anomaly “AL 12”. 
Reset PAR 1 to de-activate the alarm or
check  the  pressure  switch/combustion

product thermostat and relative connec-
tion.

HEATING PROBE POSITIONING
ANOMALY  SM1/SM2  “AL  16” 

(fig.

22/d)
If the probe does not detect a  tempera-
ture  increase  after  burner  ignition,  the
burner  switches  off  after  10  seconds,
the  display  shows  anomaly AL  16  eand
the4 green LED stays on. 
If the anomaly occurs three times within
24h  lthe  boiler  blocks,  the  display  conti-
nues to show anomaly AL 16 and the red
LED switches on. 
Press

on  the  control  panel  to re-start

the boiler.

SENSOR ALIGNMENT ERROR  “AL  17"

When  the  two  sensitive  elements  of  the
heating  probe  (SM1/SM2)  dif fer  to
each other by more than 16°C the boiler
does  not  function  and  the  display  shows
anomaly AL 17. 
Re p l a c e 

t h e 

h e a t i n g 

p r o b e

(SM1/SM2) to restore functioning.

Fig. 22/d

Page 31 of 34

Summary of Contents for sime 30e

Page 1: ...er Service and Installation Instructions 30i 30e WARNING The installation of this product must be carried out only by authorised personnel to the requirements of Australian Standard AS 5601 local auth...

Page 2: ...ed instal ler the boiler is warranted by Hunt Heating against defects caused by the manufacturer s faulty materials and or work manship in respect to parts and labour for a period of twelve months com...

Page 3: ...hat they do not play with the appliance LIGHTING AND OPERATION BOILER IGNITION fig 23 The first ignition of the boiler must be car ried out by qualified technical personnel Successively if it is neces...

Page 4: ...ted The display will be as shown in fig 25 TO SWITCH OFF THE BOILER fig 26 In the case of a short absence touch more than two second the key of the controls The display will be as shown in figure boil...

Page 5: ...ersonnel Call a qualified technical personnel Call a qualified technical personnel Call a qualified technical personnel AL 05 AL 06 fig 28 b Press the key of the controls to re start the boiler If the...

Page 6: ...on unless safe to do so Check why it was turned OFF Do the other gas appliances work Does it work If NO go to Q4 4 Room Thermostat Is the display very dim or not showing at all Is the room thermostat...

Page 7: ...s LPG Internal External Gas pressure Settings Max Pa Adjusted output setting kW Central Heating Water treatment System Volume Litres No Yes Yes Product Qty Used Litres Dilution rate Litres per 100 lit...

Page 8: ...nel control 9 Boiler should start fan pump and ignite gas If it fails first few times this may be just residual air In the gas line A noisy water pump indicates there is air in the water pipes 10 Boil...

Page 9: ...Where all the major items are their functions and how to check and turn them on or off Simple fault resolution i e power on 5 How to check and remove air in the radiators Give them a bleed key 6 The...

Page 10: ...ct phone number Work Completed Service Service 3 4 year 5 year 7 Date Date Service technician Service technician Name PIC L icence No Name PIC L icence No Service Company Service Company Contact phone...

Page 11: ...Service Service 7 8 year 11 year 13 Date Date Service technician Service technician Name PIC L icence No Name PIC L icence No Service Company Service Company Contact phone number Contact phone number...

Page 12: ...6 0 INSTALLER INSTRUCTIONS CONTENTS 6 1 DESCRIPTION OF THE BOILER page 13 6 2 INSTALLATION page 18 6 3 CHARACTERISTICS page 26 6 4 USE AND MAINTENANCE 6 5 FAULT FINDING page 30 page 32 Page 12 of 34...

Page 13: ...led boiler This manual gives the instructions for The instructions given in this manual are provided to ensure proper installation and operation of these boilers 6 1 DESCRIPTION OF THE BOILER CONNECTI...

Page 14: ...kg NG mm dia LPG 0 85 mm dia 1 45 NG LPG2 50 kPa 0 79 kPa 13 injectosr 3 0 Bar 6 1 litres 85 C 10 litres 1 2 Bar Water content boiler Maximum water head Maximum temperature Capacity of the heating exp...

Page 15: ...safety valve 9 Water pressure valve 10 By pass 11 Boiler discharge 12 Expansion vessel 13 Pressure Guage 14 Connection plate 15 Gas valve compulsory 16 C H flow valve recommended 17 C H return valve...

Page 16: ...Y 1 Control panel 2 Circulation pump 3 Air relief valve 4 Burners 5 Expansion vessel 6 Air pressure switch 7 Fan 8 C H sensor 9 Primary exchanger 10 Ignition detection electrode 11 Gas valve FORMAT DG...

Page 17: ...ns The safety valve drain must be connected to a collection funnel to collect any discharge during interventions If the heating system is on a higher floor than the boiler install the on off taps supp...

Page 18: ...th a density of 50 kg m The maximum total length which is the sum of lengths of the aspiration and discharge pipes is determined by the loss of charge of the single accessories inser ted and must not...

Page 19: ...ss of a DGT 30i boiler installation allowed as the sum of the head losses of the accessories used is less than 9 5 mm H2 O 93 2 Pa Intake Outlet 7 meter horizontal pipe 80 x 0 25 2 45 Pa 1 75 17 20 7...

Page 20: ...4 8 39 2 47 1 from No 1 to 6 4 8 5 6 47 1 54 9 from No 1 to 7 5 6 6 5 54 9 63 7 from No 1 to 8 6 5 7 3 63 7 71 6 from No 1 to 9 7 3 7 8 71 6 76 5 from No 1 to 10 7 8 8 4 76 5 82 4 without diaphragm 8...

Page 21: ...ventilation Space heaters up to 50 MJ h input 150 150 Other appliances up to 50 MJ h input 500 500 Appliances over 50 MJ h input and up to 150 MJ h input 1000 1000 n Appliances over 150 MJ h input 150...

Page 22: ...e remote control of the boiler except release of the boiler When the connection has been made the boiler display will show the following messa ge Cr For installation and use of the remote con trol fol...

Page 23: ...Fan EAR Ignition detection electrode EV1 2 Gas valve coil PF Smoke pressure switch M Modulator SM1 SM2 Heating sensor PA Water pressure switch TA ROOM THERMOSTAT SE External sensor S AUX Auxiliary sen...

Page 24: ...e anomaly is signalled D H W SET Press the key to display the D H W temperature value set NON OPERATIONAL HEATING SET Press the key to display the heating temperature value set value not realtive to t...

Page 25: ...1 18 Re ignition delay 0 10 Min 1 03 19 Modulation D H W flowmeter Disabled 01 1 Enabled 29 Anti legionella only D H W tank Disabled C 1 50 80 PARAMETERS RE SET PAR DESCRIPTION RANGE U UN NIIT T INC D...

Page 26: ...r will not function for both services 6 3 6 ELECTRONIC IGNITION Ignition and flame detection is controlled by a single electrode on the burner which gua rantees reaction in the case of accidental exti...

Page 27: ...as a function of rate of flow in the graph in fig 16 To obtain the maximum head available to the system turn off the by pass by turning the union to the vertical position fig 17 0 200 1600 1400 1200...

Page 28: ...of the generator in the following way Turn the main switch off to stop electric power reaching the boiler and close the gas feed cock Remove the outer casing and the gas burner manifold unit To clean...

Page 29: ...gas connections after assembly using soapy water or a product made specifically for the purpose being sure not to use open flame 6 4 2 1 New fuel configuration Access the parameters section by pres s...

Page 30: ...22 a If the pressure detected by the water pressure valve is lower than 0 5 bar the boiler stops and the display shows the alarm AL 02 Bring the pressure back to normal by means by acting on the tele...

Page 31: ...installer for PAR 1 and the self detection carried out by the card causes the activation of the alarm the boiler will not function and the display will show anomaly AL 12 Reset PAR 1 to de activate t...

Page 32: ...Replace the fan Is there voltage available to the pump Replace clock the thermostat Check pump connection Is pump shaft free to rotate Replace the pump Make it free to rotate Has the PCB ignition lock...

Page 33: ...BLANK PAGE Page 33 of 34...

Page 34: ...30e CENTRAL HEATING BOILER version 1 Issued June 2010 HYDRONIC SYSTEMS Australia Pty Ltd 11 Fiveways Boulevard Keysborough Victoria 3173 Telephone 1300 00 1800 Facsimile 9798 5133 www huntheat com au...

Reviews: