Chapter 2 • Pointing the antenna
26
1037663-0001 Revision A
When the reading is complete, the DAPT display reads:
3. Rotate the squinter 180 degrees to the opposite azimuth
position and press
Advance
.
The DAPT display reads
Wait AZ2
while the IDU records
the second azimuth reading. (This process could take up to 15
seconds.)
When the difference between the pair of azimuth
measurements is within 15 SQF points, the test will pass and
the DAPT display will read:
4. Press
Advance
to proceed to the elevation test. The DAPT
display shows a
Wait
message for approximately 15
seconds, then reads:
5. Rotate the squinter 90 degrees to the first elevation position
and press
Advance
.
The DAPT display reads
Wait EL1
while the IDU records
the first elevation measurement. (This process could take up
to 15 seconds.) When the reading is complete, the DAPT
display reads:
Note:
If the azimuth test fails, press
Back
to return to the
SQNT AZ1 state and repoint the antenna’s azimuth plane.
Summary of Contents for HughesNet Ka-band
Page 1: ...1037663 0001 Revision A March 26 2008 Ka Band Antenna Pointing Guide ...
Page 4: ... Contents iv 1037663 0001 Revision A ...
Page 6: ... Figures vi 1037663 0001 Revision A ...
Page 8: ... Tables viii 1037663 0001 Revision A ...
Page 14: ...Chapter 1 Introduction 6 1037663 0001 Revision A ...
Page 40: ...Chapter 2 Pointing the antenna 32 1037663 0001 Revision A ...
Page 42: ... Acronyms and abbreviations 34 1037663 0001 Revision A ...