Huck Seiltechnik GmbH • 35614 Aßlar/Berghausen • Germany
[email protected] • www.huck.net
\\Fileserver\text\PLAY\Play Installation Instructions\Installation Instructions 2012-2013\4540_10-01-en-010.doc
- 3 -
1 Introduction
Assembling
1.1 General
information
This equipment should be installed, inspected, maintained and operated in
accordance with EN1176-7 guidelines.
Before installation work commences, please check that you have all of
the equipment and fixation components in the parts list provided (see
Tables 3-1 and 3-2).
Please consider that the installation has to be carried out only on even
terrain (max.slope up to 3%).
Any spare parts that may be required can be obtained directly from your
supplier.
Please do not hesitate to call your supplier
if you have any problems during
installation or in case of any other questions.
Following installation, complete assembly instructions, maintenance
instructions and a maintenance record must be sent to the operator who
must confirm receipt in writing. See the last page of this document.
All nuts and bolts are hot-dip galvanised or stainless steel.
One of the characteristics of stainless steel is that uncontrolled cold
welding may occur when the nuts are tightened. To prevent this, it is
necessary to spray the nuts and bolts with Teflon spray or another similar
lubricant.
We hereby confirm that this play equipment has been tested and
certified in accordance with the play equipment standard EN 1176.