Huck Seiltechnik GmbH • 35614 Aßlar/Berghausen • Germany
[email protected] • www.huck.net
24
\\Fileserver\text\PLAY\Play Installation Instructions\Installation Instructions 2012-2013\4540_10-01-en-010.doc
10 Monthly maintenance
10.1 Check the spaces between the equipment and the ground (clearance and
height of fall).
10.2 Check the ground surface in the area with fall protection for hard objects
and loose foundations.
10.3 Check all connecting elements and fittings for wear and tear and tighten
if necessary. Replace damaged or missing parts.
10.4 Check that moving metal parts (joints, springs, etc.) move smoothly and
are not worn. Replace if necessary. It is not necessary to lubricate joints
as we only use maintenance-free metal roller bearings.
10.5 Check all attachments such as chains, ropes, nets, etc. for damage and
replace if necessary.
10.6 Check rubber parts, sleeves, etc. for wear and tear or damage and
replace if necessary.
10.7 If necessary, remove excess padding maaaterial from the post footings
due to danger of rotting.
10.8 Check the surface of wooden parts for damage caused by the weather or
external influences and mould. Repair or replace if necessary. Check the
surface of plastic and metal parts, e.g. slides, for damage and replace if
necessary.
10.9 Lubricate swing joint if necessary.
11 Quarterly maintenance
11.1 Detailed inspection of the operation and stability of the equipment
paying particular attention to any wear and tear.
11.2 Tighten all forms of attachment.
11.3 Repaint and retreat surfaces.
11.4 Maintenance of fall protection surfaces.
11.5 Lubrication of joints.
11.6 Check the height of the fall and top up with loose filler if necessary. If the
posts are labelled, top up as far as the mark.
11.7 Retighten all bolts
12 Half yearly maintenance
12.1 Stability (check posts, bracing, foundations, etc.).