Huck Seiltechnik GmbH • 35614 Aßlar/Berghausen • Germany
[email protected] • www.huck.net
20
\\Fileserver\text\PLAY\Play Installation Instructions\Installation Instructions 2012-2013\4540_10-01-en-010.doc
7.10 Faults
Faults must be repaired as soon as they are detected. If serious defects
that compromise safety cannot be repaired straight away, the public must
be prevented from using the equipment with immediate effect.
7.11 Loose
screws
Loose screws always cause quality problems and put safety at risk.
Therefore, loose screws should always be tightened and checks carried
out to ensure that there are no missing screws (e.g. look out for holes you
can see through).
7.12 Preventing equipment use
Use of the equipment should be prevented in the event of incomplete
installation, disassembly, maintenance, repairs and faults.
7.13 Safeguarding the guarantee
8 Steel posts and footings are guaranteed if regular maintenance
is carried out and recorded in writing. Maintenance first takes
place after 3 years. The steel posts must be excavated as far as
the concrete foundations and checked for corrosion. Zinc paint
should be applied to any corroded areas and scratches.