Hubbel Chance BP3 Installation, Operation And Maintenance Manual Download Page 9

9 of 12

P805-0011 Rev. A

©

2002 Hubbell Power Systems, Inc., 210 North Allen Street, Centralia, MO 65240 U.S.A.

Opening Switch

• To open the BP3 switch, place a

hookstick in the pull ring as shown in
Figure 8.

!

 

 WARNING

High Voltage Electric Arc Hazard.

Opening an energized disconnect switch without a loadbreak tool will
create an electrical arc.

Can cause death, severe personal injury or property damage.

Use appropriately rated loadbreak tool to open a switch that is carry-
ing load current.

• Turn head and look away from the switch.

Quickly, firmly and without hesitation

pull down and towards the hinge end of
the switch at about a 45

°

 angle.

Figure  8

• Once the switch is open, complete the

blade travel to its stop position.

• Carefully remove the hookstick from the

pull ring.

Operation

• The by-pass blade is equipped with an

open blade latch. Visually check that the
stop pin has engaged the open blade
latch.

• The by-pass blade of the BP3 switch is

also equipped with loadbreak hooks for
use with a loadbreak tool.

• To open the by-pass blade of the switch

under load, use only an approved
loadbreak tool or device designed for use
with switches.

• Follow the instructions provided with such

tools.

Summary of Contents for Chance BP3

Page 1: ...pe BP3 3 Pull By Pass Switch for Distribution Switching HUBBELL POWER SYSTEMS INC 210 North Allen Street Centralia MO 65240 1395 U S A Telephone 573 682 5521 IMPORTANT Keep this manual readily availab...

Page 2: ...with established safety practices c trained in the proper care and use of protective equipment such as rubber gloves hard hat safety glasses or face shields flash clothing etc in accordance with estab...

Page 3: ...ified for capacities other than what was shipped with the units If a different capacity is desired contact your supervisor or factory representative to se cure the appropriate unit Overview Function T...

Page 4: ...ing without the use of a back strap or pole mounting bracket The structure must be drilled to match the base mounting holes or slots The user supplies the mounting hard ware 3 Terminal Connectors 3 va...

Page 5: ...ch base Leave switch on its pallet until ready to install Compare switch with the photo to be sure all items have been included Contact your factory representative if any parts are missing If desired...

Page 6: ...vided back strap and appropriate length bolts Adjust the bolts in the switch base and back strap slots to fit close to the vertical structure Torque mounting hardware nuts to 60 ft lb Leave bolt head...

Page 7: ...onductors will be secured Wire brush conductor surfaces Apply a contact sealing paste to the cleaned surfaces A B Chance Z L N or equivalent Assemble connectors conductors and hardware to the switch t...

Page 8: ...rmal Operating Position By Pass Operating Position Recloser Recloser By Pass Switch By Pass Blade Source Load Disconnect Blade Disconnect Blade Recloser Recloser By Pass Switch By Pass Blade Source Lo...

Page 9: ...ead and look away from the switch Quickly firmly and without hesitation pull down and towards the hinge end of the switch at about a 45 angle Figure 8 Once the switch is open complete the blade travel...

Page 10: ...single sided loadbreak hooks The loadbreak hooks allow the use of a loadbreak tool for the switching of load capacitor line cable charging and magnetizing currents To open loadbreak hook equipped disc...

Page 11: ...enance check at least once a year more frequently if located in a contaminated area For additional recommendations refer to ANSI C37 35 IEEE Guide for the Applica tion Installation Operation And Maint...

Page 12: ...12 of 12 P805 0011 Rev A 2002 Hubbell Power Systems Inc 210 North Allen Street Centralia MO 65240 U S A Notes Records...

Reviews: