3.2 Operation

3.2.1 Preparation

After successful commissioning, instrument can start normal operation. For testing operation

procedures, see ASTM test method standard.

3.2.2 Heating rate

Load sample as requirement, turn on “POWER” and “RUN”: button, adjust voltage dial to heat the

sample, observe thermometer reader, and adjust the voltage suitably so as to meet the test

requirement.

Temperature rising rate: 1

/min

3.2.3 Test condition

Get through the gas source and ignite the ever-light flame and pilot flame, adjust the size of pilot

flame to 3mm-4mm, and adjust ever-light flame to a little bigger. Press “FIRE” for 1 second, the pilot

flame will be descended.

3.2.4

When test operation is complete, adjust voltmeter back to “0”, turn off “RUN”, switch off gas

source, remove all liquid medium in the bath.

VI.Trouble and trouble shooting

Trouble

Cause

Solution

Power
indicator light
is dark

1. Power is disconnect
2. Power switch is broken
3. Fuse is broken

1. Check if power socket is

connected

2. Replacement
3. Replacement

Voltmeter
shows “0”

1. Potentiometer has open

circuit

2. SSR has open circuit or

loop is broken

1. Replacement
2. Replacement or connected broken

loop

Voltmeter
shows “220V”

1. SSR is broken

1. Replacement

Stir motor

does not
work

1. Stir switch is broken
2. Motor gets stuck
3. Motor is damaged

1. Replacement
2. Adjust shaft lever in main shaft,

clean up dirt

3. Replacement

Ignition motor

does not

1. Ignition switch is broken
2. Motor is damaged

1.Replacement
2.Replacement

Summary of Contents for HZBS-002

Page 1: ...HZBS 002 Abel Flash Point Tester User Manual Huazheng Electric Manufacturing Baoding Co Ltd...

Page 2: ...nd operate and maintain the instrument according to the manual to prolong its service life Just a light press the test will be completed automatically is the operating characteristics of this instrume...

Page 3: ...Contents I General 1 II Installation and commissioning 2 III Operation 5 VI Trouble and trouble shooting 7 V Maintenance 8...

Page 4: ...d by SSR which can satisfy requirements of different heating rate Continuously stirring the sample and stirring is auto stopped during igniting Electrical controlled ignition Test cup lid with stirrin...

Page 5: ...mperature rise rate Stirring rate can be adjusted in range of 0 40 roll min by stirrer adjust button Stirrer will be stop working during ignition 1 3 3 Gas source Beside master gas valve we have adjus...

Page 6: ...2 2 1 The instrument should be placed on steady test platform with no airflow around 2 2 2 The distance between instrument and the walls or other shields should be not less than 200mm 2 3 Installation...

Page 7: ...t gas source into gas inlet and fix well If test in low temperature connect intake pipe to In Out liquid joint connect liquid return pipe to overflow pipe and fix well If test not in low temperature y...

Page 8: ...alve and adjusting valves connect the gas source with the master gas valve When igniting turn on the master valve Fully or half open depending on the gas pressure and turn left the igniting adjusting...

Page 9: ...point of sample around 15 user can use icy water as medium and if flash point around 40 water with normal temperature can be used Switch off the water inlet cover and funnel the medium into the bath S...

Page 10: ...will be descended 3 2 4 When test operation is complete adjust voltmeter back to 0 turn off RUN switch off gas source remove all liquid medium in the bath VI Trouble and trouble shooting Trouble Caus...

Page 11: ...haft and stationary shaft homocentric Fire go out when ignition 1 Test flame too small 2 Disturbing air flow 1 Adjust flame size 2 Prevent air flow V Maintenance 5 1 The instrument should be placed at...

Reviews: