background image

11

that the instrument is normal; otherwise, there is something wrong with the instrument.

If there is no short connection, the yellow, green, red and black connecting pliers on the

high-voltage side of the test line can also be connected together with the yellow, green,

red and black connecting pliers on the low-voltage side

.

VIII.After-sale Service

The product can be repaired free of charge or changed by a new one if it has

quality problem for one year from sale. We can provide reparation and technical services

for the whole life of the products. Please contact with us if there is any trouble and

abnormal situation so that we can arrange the best solution for you.

IX.Packing List

No.

Item

Qty

1

Main engine

1

2

Power line

1

3

Red test line

1

4

Black test line

1

5

Fuse pipe

2

6

Print paper

1

7

Ground lead

1

8

Serial port line

1

Summary of Contents for HZBB-10A

Page 1: ...HZBB 10A Transformer Turns Ratio Tester Huazheng Electric Manufacturing Baoding Co Ltd...

Page 2: ...al and operate and maintain the instrument according to the manual to prolong its service life Just a light press the test will be completed automatically is the operating characteristics of this inst...

Page 3: ...d Characters 1 III Technical Index 2 IV Operating Panel Instructions 2 V Operating Instructions VI Connecting Method 3 VII Notice 9 VIII Instrument Common Problems And Inspection Methods 10 VIII After...

Page 4: ...ement and the measurement is more accurate When the working power source is a generator there is no impact 2 Three phase output voltage is adopted to improve the test speed The angle between phases ca...

Page 5: ...0000 Angle 0 360 2 Angle measurement 0 360 3 Accuracy 0 1 below500 0 2 501 2000 0 5 2001 10000 4 Output voltage automatically adjusted according to load 5 Resolution Minimum is 0 0001 Angle 0 01 6 Wor...

Page 6: ...220V frequency power supply 5 Protective grounding column 6 Communication serial communication 7 USB U disk storage 8 Printer Print the testing results after tested V Instructions Menu description Fig...

Page 7: ...e phase measurement z type transformer Scott transformer setting method are basically the same no longer repeat Test completion interface as shown below Figure 3 test completion interface 2 After the...

Page 8: ...4 Click Time Setting to enter the time setting interface as shown in Figure 5 Figure 5 Click Year Month Day Hour Minute Second and the keyboard will pop up to set the time After entering the value cli...

Page 9: ...Figure 7 Transformation ratio Click the transformation ratio button to switch to turns ratio data Previous Next You can view and print historical data Dump is to store the current data to the U disk P...

Page 10: ...ord input and the user does not need to modify it Bluetooth Click Bluetooth to pop up the QR code as shown in Figure 9 scan the QR code with the corresponding software downloaded in the mobile phone t...

Page 11: ...ing Object The Tester Idle Black 2 525 3 4 2 50 20 Single Phase Transformer and High Voltage connecting is according to the Diagram 2 as follows A O a b O Green Black Black Yellow Yellow Low Voltage H...

Page 12: ...tapping the voltage combination of 110 8 1 25 10 0 transformers the rated tapping is 8 1 means 9 Enter the rated bit This gives an accurate measurement of the tapping position of the transformer whos...

Page 13: ...sition and actual position inversion 8 Low voltage level of the transformer when the input voltage value is not enough the high and low voltage can be multiplied by 10 or 100 and so on 9 To test the S...

Page 14: ...e side VIII After sale Service The product can be repaired free of charge or changed by a new one if it has quality problem for one year from sale We can provide reparation and technical services for...

Reviews: