Figure 7-16 Power adjustment parameters
Table 7-8 Power adjustment parameters
Parameter
Description
Remote power schedule
If this parameter is set to Enable, the inverter responds to the
scheduling instruction from the remote port. If this parameter
is set to Disable, the inverter does not respond to the
scheduling instruction from the remote port.
Schedule instruction valid
duration (s)
Specifies the time for maintaining the scheduling instruction.
When this parameter is set to 0, the scheduling instruction
takes effect permanently.
Maximum active power (kW)
Specifies the output upper threshold for the maximum active
power to adapt to different market requirements.
SUN2000-(75KTL, 100KTL, 110KTL, 125KTL) Series
User Manual
7 Man-Machine Interactions
Issue 11 (2021-11-10)
Copyright © Huawei Technologies Co., Ltd.
96