Electrostatic Discharge

Before touching the device or holding the boards and IC chips, wear the ESD gloves or the ESD wrist 

strap (Ensure that the other end of the ESD wrist strap is well grounded) to prevent the electrostatic 

discharge of the human body from damaging the sensitive components. 

Attaching Labels or Tags

• After routing the cable, attach the label or fasten the tag to the cable, and 20 mm away from the 

connector.

• When the signal cable is placed vertically, the label should point towards the right. When the cable is 

placed horizontally, the label should point downwards. After bundling the cables, the completed 

identification plate should be visible on the top of the cable in the horizontal cabling, or on the right 

side of the cable in the vertical cabling. Make sure that the label points outwards.

ESD gloves

ESD wrist strap

Indoor climbing work should ensure that the ladder (or other load bearing equipment) stable, 

ascending the operation of the operator, tools and materials should be properly disposed so as not 

to fall, ascending operation during its operation area part of the ground personnel should wear 

safety helmet or evacuate; operators should wear safety rope, clothing, shoes, a tool into the tool 

bag, attention when people climb ahead of the tool, tool ahead of people evacuation.

Hardware installation operation of all should be under the condition without electricity, if need to 

have charged equipment operation, operation personnel in addition to tools, clothes do not have 

other exposed metal objects, and tools and metal parts of tape is wrapped around the insulation, 

the operator must wear insulated gloves. 

Safety Precautions

Copyright © Huawei Technologies Co., Ltd. 2016. All rights 
reserved.

Precautions

Summary of Contents for SmartAX MA5811S-AE08

Page 1: ...HUAWEI TECHNOLOGIES CO LTD SmartAX MA5811S AE08 Multi service Access Module V800R017C10 Installation Guide Issue 01 Date 2016 09 14 ...

Page 2: ...b Installing the MA5811S AE08 on the wall 9 5 Routing the Cables 11 a Routing a PGND Cable 11 b Connecting a Subscriber Cable 12 c Routing an Optical Fiber 17 6 Checking the Installation 19 7 Checking Device Running used backup power 20 8 Checking Upstream Port Optical Power 21 9 Checking Device Running 22 10 FAQs for Installation 23 Contents ...

Page 3: ... cabling Make sure that the label points outwards ESD gloves ESD wrist strap Indoor climbing work should ensure that the ladder or other load bearing equipment stable ascending the operation of the operator tools and materials should be properly disposed so as not to fall ascending operation during its operation area part of the ground personnel should wear safety helmet or evacuate operators shou...

Page 4: ...er Flat head screwdriver Phillips screwdriver Diagonal pliers Cable cutter ESD gloves Multimeter Optical power meter Paper knife Measuring tape Check Tools and Meters Crimping tool 5 M6 wrench Impact tool HUAWEI JPX Hammer drill Locking pliers 3 M4 wrench ...

Page 5: ...rt for the terminal block Internal Structure without terminal block Ground point Upstream optical port 2 3 5 6 8 1 2 3 4 1 5 6 7 Maintenance serial port PGND cable entrance Optical fiber entrance 7 8 Subscriber cable entrance 1 4 330 mm 230 mm Reserved ...

Page 6: ...Structure with terminal block Ground point Upstream optical port 2 3 5 6 8 1 2 3 4 1 5 6 7 Maintenance serial port PGND cable entrance Optical fiber entrance 7 8 Subscriber cable entrance 1 4 Reserved Subscriber cable assembly Subscriber cable connector Terminal block ...

Page 7: ...nstalling the Chassis Installing MA5811S AE08 on a Pole 1 2 3 Insert hose clamps into the mounting bracket Use a hex key to fix the mounting bracket onto the pole Trim excess hose clamps off M6 5 M6 wrench ...

Page 8: ...11S AE08 on a Pole 5 Use a Phillips screwdriver to fix the screws in the bottom of the mounting bracket Wrap the clipped hose clamp using insulation tapes Coiling the excess hose clamp on the pole and binding it using a cable tie is recommended for convenience of follow up migration 180 mm 4 ...

Page 9: ...y placed and mark anchor points 9 Installing the Chassis Installing MA5811S AE08 on the wall 1 2 Hammer drill Maker Drill holes on the wall according to marked installation points and Install M6 x 60 expansion bolts hole diameter 8 5 mm hole depth 45 mm to 55 mm Nut Spring washer Expansion sleeve Flat washer Bolt ...

Page 10: ... to complete the installation 4 Install mounting kits into the wall 3 Bottom view Note Theoretically the MA5811S AE08 can be reversely installed However it can only be reversely installed indoors without any water leakage To reversely install the MA5811S AE08 use the M4 wrench to remove its mounting kits as shown in the right figure and then reversely install it ...

Page 11: ...rough the device compartment 1 Make an OT terminal onsite 2 Use a Phillips screwdriver to fix the PGND cable 3 Securely install the cap of the waterproof connector at the PGND cable entrance Route it to the ground bar Making PGND Cables with OT Terminals The structure of the MA5811S AE08 in the document is slightly different from the actual device however the difference does not affect device inst...

Page 12: ... through the cap waterproof connector and device compartment 3 1 Install the terminal block to the support delivered in the package The terminal block should be provide by the user 2 Use the impact tool to route the user side subscriber cable 3 Use the impact tool to route the device side subscriber cable to the terminal block 350 mm User side subscriber cable Device side subscriber cable ...

Page 13: ...ce 3 Bind the user side subscriber cable to the wire saddle using the binding tape Support of the terminal block Pin assignments of the subscriber cable is shown in the following table Color Relation Port Color Relation Port White Pair 0 White Pair 4 Blue Grey White Pair 1 Red Pair 5 Orange Blue White Pair 2 Red Pair 6 Green Orange White Pair 3 Red Pair 7 Brown Green ...

Page 14: ...5811S AE08 with terminal block 1 Remove the cap from the waterproof connector at the subscriber cable entrance 2 Route the subscriber cable through the cap waterproof connector and device compartment 3 Remove the support from the MA5811S AE08 350 mm ...

Page 15: ...ge White Pair 3 Red Pair 7 Brown Green 15 Routing Cables Routing a Subscriber Cable MA5811S AE08 with terminal block 4 Install the terminal block to the support Support of the terminal block Pin assignments of the subscriber cable is shown in the following table Use the impact tool to route the user side subscriber cable 5 Impact tool HUAWEI JPX ...

Page 16: ...g Cables Routing a Subscriber Cable MA5811S AE08 with terminal block 6 1 Install the support routed with subscriber cables to the device 2 Install the connector of the subscriber cable to the subscriber port 1 2 ...

Page 17: ...ctor at the optical fiber The MA5811S AE08 supports 10G GPON GPON 10GE and GE upstream transmission These four upstream transmission modes have different optical models and optical fibers but they have the same installation modes The following uses GE upstream transmission as an example GE upstream LC UPC GPON upstream SC UPC ...

Page 18: ...al Fiber 4 Entrance and route the optical fiber through the device compartment 5 Use the Phillips screwdriver to fasten the clip 6 Coil the optical fiber and fasten the waterproof connector 3 Use a Phillips screwdriver to open the clip ...

Page 19: ...rtically without crossover Proper margins must be reserved at the turning Observe 6 The power cable and PGND cable must be connected correctly and reliably Observe 7 The identifiers on the power cable and PGND cable must be correct legible and neat Observe 8 The power cable PGND cable and signal cables must be routed separately Observe 9 Signal cables must be long enough and must not be damaged or...

Page 20: ...ly Before the test connect local power to the BATTERY hole If the RUN ALM indicator blinks green on for 1s and off for 1s the device can run normally For details about indicator status of the MA5811S AE08 see Page18 The device side connector on the electrical cable must meet the following requirements if users perform a test using self prepared electrical cable Output of the local power 12 V DC 3 ...

Page 21: ...e the MA5811S AE08 can be functional for a short period of time To ensure that the MA5811S AE08 is functional for a long period of time adjust the receive optical power 1 Set the wavelength of an optical power meter to 1490 nm and use it to measure the output power on optical fibers 2 If the test result exceeds the preceding range use an optical attenuator on the OLT side to decrease the input opt...

Page 22: ...ed Blinking green The G fast port is receiving and transmitting data Off The G fast port is not activated Indicator status After the device is powered on the RUN ALM indicator starts blinking green at an interval of 0 25s About 4 minutes later it is normal blinking green at an interval of 1s If the upstream port mode is correct and the Rx optical power of the upstream port is within the normal ran...

Page 23: ...aint on the ground point should be removed to ensure proper grounding After the cable is connected to the ground point the ground point should be repainted When routing cables out of the network cabinet ground the outer jacket of the cable to the nearest ground point on the network cabinet side or use the metal tube that is grounded to route cables Coil and protect the redundant optical fiber in t...