
About This Document
Purpose
This document describes the process of installing a DC blade RRU3260 (referred to as RRU
in this document).
Product Versions
The following table lists the product versions related to this document.
Product Name
Solution Version
Product Version
DBS3900
SRAN6.0 and later versions
V100R004C00 and later
versions
eRAN2.1 and later versions
V100R003C00 and later
versions
Intended Audience
This document is intended for:
Base station installation engineers
Organization
1 Changes in the RRU3260 Installation Guide
This chapter describes the changes in the
RRU3260 Installation Guide
.
This chapter describes the reference documents, tools, and instruments that must be ready
before the installation. In addition, it specifies the skills and prerequisites that installation
engineers must have.
3 Information About the Installation
Before installing an RRU, you must be familiar with its exterior, ports, indicators, installation
options and installation clearance requirements.
RRU3260
Installation Guide
About This Document
Issue 10 (2015-12-30)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
ii