R240D
Hardware Installation and Maintenance Guide
5 Appendix
Issue 03 (2016-01-26)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
69
Item
Requirements
dustproof plastic tape. Use double-pane glass in the windows and seal
them tightly.
Wall surface
treatment
Paste wallpaper on the wall or apply flat paint. Do not use pulverized
paint.
Cable trays
Use cable trays to arrange cables. The inner faces of the cable trays must
be smooth. The reserved length and width of the cable trays, and the
number, position and dimensions of the holes must comply with the
requirements of device arrangement.
Water pipe
Do not pass service pipes, drainpipes, and storm sewers through the
equipment room. Do not place a fire hydrant in the equipment room, but
place it in the corridor or near the staircase.
Internal
partition wall
Separate the area where the equipment is installed from the equipment
room door. The partition wall can block some outside dust.
Installation
position of the
air conditioner
Install air conditioner vents so that the air does not blow directly on
equipment.
Other
requirements
Avoid the proliferation of mildew, and keep out rodents (like mice).
Figure 5-80
Internal partition wall inside the equipment room
Equipment Room Environment
Dust on devices may cause electrostatic discharge and result in poor contact for connectors or
metal connection points. This problem can shorten the life span of devices and cause faults.
The equipment room must be free from explosive, conductive, magnetically-permeable, and
corrosive dust. Table 5-11 lists the requirement for dust concentration in the equipment room.