9
a
If not specified, the VIS6000 in this document refers to the
VIS6000 in the production center.
The table lists the device positions in the cabinet. Install
the VIS6000 and other devices based on the actual
environment.
Install the VIS6000 at the bottom of the cabinet for the
convenience of ventilation and heat dissipation of VIS6000
components.
1 Specifying the Position of
the VIS6000 in the Cabinet
a
Locate the VIS6000
Installing the VIS6000 in the Cabinet
▲
Filler panel (2U)
■
▲
●
■
▲
●
■
▲
●
■
▲
AC power distribution box (3U)
VIS6000 (4U)
▲
▲
▲
▲
▲
▲
:Filler panel (1U)
■
:Other devices (1U)
●
:Cabling subrack (1U)
Storage devices (4U)
Storage devices (4U)
Storage devices (4U)
Storage devices (4U)
Filler panel (4U)
Filler panel (4U)