Step 5 Install load cables.
1. Remove the protective cover from the load wiring port.
2. Remove the ring buckle.
3. Press the front part of the round connector backwards and insert the
connector into the load wiring port.
4. Check the insertion depth of the round connector. Ensure that the red line is
not visible.
5. Reinstall the ring buckle.
6. Check whether the round connector is securely installed. You can slightly pull
the connector to check whether it is loose. If it is loose, install it again.
NO TICE
● When a cable terminal is connected in place, you will hear a click.
● You need to install a ring buckle to fasten the cable terminal.
● If not prefabricated, the cables from the power distribution unit to the cabinet
rPDU need to be prepared onsite. For details, see the appendix
Table 3-5 Load cable silk screen
Output Connector
Single-Phase Power
Distribution Unit
Three-Phase Power
Distribution Unit
XT1
QF1
QF1
QF2
XT2
QF3
QF2
QF4
XT3
QF5
-
QF6
New Main Way 2.0
User Manual
3 Installation
Issue 05 (2020-10-15)
Copyright © Huawei Technologies Co., Ltd.
38