![Huawei NE08E-S6 Quick Installation Manual Download Page 7](http://html.mh-extra.com/html/huawei/ne08e-s6/ne08e-s6_quick-installation-manual_169424007.webp)
Standalone Deployment of a Lightning Protection Component
4
Install the dual-female conversion adapter on
the Protect interface of the lightning protection
component.
Connect one end of the coaxial cable to the RF
OUT interface of the amplifier, and use the
wrench to secure the joint.
Connect one end of the coaxial cable to the
Protect interface of the lightning protection
component, and use a wrench to secure the
joint.
For requirements on the GPS installation, see
GPS Satellite Antenna System Quick Installation Guide
.
For requirements on the GPS antenna position, see
Appendixes
2.
This document describes how to connect the ATOM GPS to the GPS.
Deploy amplifiers based on the GPS feeder length. Deploy one amplifier if the feeder length exceeds 80 m.
Dual-female
conversion
adapter
Lightning
protection
component
Protect
Surge
Installing the GPS Satellite Antenna System
Deployment of a Lightning Protection Component Together with an Amplifier
Surge
Connect the RF IN interface of the amplifier to the
Protect interface of the lightning protection
component, and use a wrench to secure the joint.
Lightning
protection
component
Protect
Amplifier
Ground bar
Install the ground cable of the lightning
protection component.
At the joint between the coaxial cable and the
Protect interface of the lightning protection
component or the RF OUT interface of the
amplifier, implement 1+3+3 waterproof
protection. Use one cable tie on each end of
the tape to secure the adhesive tape.
NOTE
Wrap one layer
of insulation
tape.
Wrap three layers
of waterproof
tapes.
Wrap three layers
of insulation
tapes.
Use one
cable tie on
each end.