IRD6000
User Guide
2 Operation Instructions
Issue 02 (2012-12-05)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
34
Verifying the Result
If a program that failed to be displayed can be outputted to the monitor through the HDMI or
CVBS port with normal audio and video presence, the decoding succeeds.
2.5
Preparing the IRD6000 for Operation
This section describes how to prepare the IRD6000 for formal operation, which include but
not limited to:
Clearing commissioning data.
Configuring data for formal operation.
Round-inspecting the IRD6000.
2.5.1
Clearing Commissioning Data
Restore the IRD6000 to its default settings to clear data generated during the commissioning
and free up system space, ensuring that the IRD6000 works properly.
2.5.2 Configuring Data for Formal Operation
According to the formal system plan, configure data that is required for actual application.
2.5.3
Round-Inspecting the IRD6000
After the commissioning is complete, use round inspecting tools to conduct a systematic
inspection, which includes but not limited to:
Inspecting the signal strength and quality of the signal sources.
Inspecting the indicators on the front panel for any alarms, for example, any indicators in
red.
Inspecting the cables for any poor connection or installation.