HES-319M Installation
22
In cold conditions, warm the grommets before making the slits to avoid cracking the rubber.
6.
Connect Xplornet–approved 12AWG wire to the building ground point.
7.
Run the wire to the surge suppressor.
Run the wire along horizontal and vertical paths, keeping it out of sight as much as possible. Avoid sharp
bends. Use Xplornet–approved single cable clips every 24in–60cm to secure the wire to the building.
8.
Cut the wire so that it can reach through the most convenient grommet to the brass nut on the same side
as the grommet.
9.
Strip away about 1in–3cm of insulation.
10.
Pass the wire through the grommet.
11.
Loosen the nut and wrap the stripped wire
clockwise
around the brass post, between the two brass
washers.
The surge suppressor ships with a ring wiring lug on each ground terminal. You can leave these in place or
discard them, but do not use them.
12.
Tighten the nut.