3)  Press the 

TEST

 key to keep the data and save it, the screen displays the

 "HOLD" 

icon, short press the 

TEST

 key again to cancel the hold state, the screen does not display 

the 

"HOLD"

 icon. 

4)  Press the MENU key to return to the main menu. 
 
 
 
 
 
 
 
 
 
 
 
 

9.8 Soil resistivity measurement 

1)  In the menu selection, select the 

"Soil resistivity measurement"

 function and press 

the TEST to enter. 
2) After entering the soil resistivity test interface, the upper right corner of the LCD displays 
the current depth value. The depth value can be modified by short pressing the ▲ key to 
decrease  1  or  short  pressing  the  ▼  key  to  increase  1  step.  Or  long  press  ▲  key  to 
decrease 10 or long press ▼ key to increase 10 steps to modify the depth value. The 
depth value range can only be 1m~100m. 
3) Insert the test wire into the bottom port of the meter according to the color, as shown 
in the figure below. Wait for the value to stabilize and read the displayed resistance value. 
4) Press the TEST key to keep the data and save it, the screen displays the "HOLD" icon, 
short press the TEST key again to cancel the hold state, the screen does not display the 
"HOLD" icon. 
5

Press the MENU key to return to the main menu. 

 

 
 
 
 
 
 
 
 

 

9.8 Data query and deletion 

1)  In the menu selection, select the "Data query" function and press the TEST to enter. 
2)  The  stored  data  can  be  viewed  in  steps  by  pressing  the  ▲  key  to  subtract  1  or  short 

pressing the ▼ key to increase 1 step. 

3)  Or by long pressing the ▲ key to decrease 10 or long pressing the ▼ key to increase 10 

steps to view the stored data. 

4)  Press the TEST key to enter the delete mode, then press the ▲ key to confirm the deletion 

of the data, or press the ▼ key to cancel the deletion of the data. 

5)  Press the MENU key to return to the main menu. 

Summary of Contents for CE-8201

Page 1: ...MANUAL CE 8201...

Page 2: ...rement principle 8 8 4 Principle of Soil Resistivity Measurement 9 8 5 Working error principle 9 8 6 AC current measurement principle 10 8 7 Ground voltage measurement principle 10 IX Operation Method...

Page 3: ...ced in time otherwise it will cause errors The contact surface of the jaws must be kept clean and cannot be wiped with corrosive agents and rough objects When opening the trigger avoid impact on the c...

Page 4: ...rage and data upload functions III Range and accuracy Measurement mode Range Resolution Accuracy Clamp method 0 02 9 99 0 01 2 rdg 0 1 10 0 99 9 0 5 3 rdg 0 5 100 199 1 5 rdg 1 200 299 5 10 rdg 5 300...

Page 5: ...ance Range 0 00 1800 Leakage current range 0 000mA 50A Current resolution 1uA Three four wire method range 0 00 30k Soil resistivity range 0 00 9999k m Ground voltage range 600V Bluetooth Built in rec...

Page 6: ...e storage is full Overflow display OL symbol indication when over range overflow Alarm function When the measured value exceeds the alarm set value an alarm will be issued battery voltage Real time di...

Page 7: ...U key 4 5 Power button 6 TEST 7 8 Screen 9 E port 10 H port 11 USB interface 12 Charging indicator 13 ES port 14 S port VII Interface display 7 1 Interface 1 Main interface 2 Pincer 3 Three four line...

Page 8: ...time the accuracy of the measurement cannot be guaranteed and the battery should be replaced The OL symbol indicates that the measured value exceeds the measuring range of the clamp meter Alarm symbo...

Page 9: ...measures I and calculates the measured resistance R 8 2 Three four wire method measurement principle The three wire four wire method measures grounding resistance which is suitable for accurately meas...

Page 10: ...method The alternating current I flows between the E ground electrode and the H current electrode find the potential difference V between the S voltage electrode and the ES auxiliary ground electrode...

Page 11: ...EST key to enter 2 Check whether the meter displays OL then resistance measurement can be performed Otherwise you need to check whether the clamp head is tight 3 Open the clamp head and clamp into the...

Page 12: ...o enter 2 Open the clamp head and clamp the wire under test Wait for the value to stabilize and read the displayed current value 3 Short press the TEST key to keep the data and save it the screen disp...

Page 13: ...rt the test wire into the bottom port of the meter according to the color as shown in the figure below Wait for the value to stabilize and read the displayed resistance value 4 Press the TEST key to k...

Page 14: ...ort press the MENU key in the layer where the alarm type is selected to return to the menu interface 9 Long press the MENU button on any interface to enable or disable the alarm function 10 X Battery...

Page 15: ...technical sense but Since the grounding hemisphere of each tower is much smaller than the distance between the towers and after all the number of grounding points is large R0 is much smaller than R1 T...

Page 16: ...le point grounding However users can use a test wire and a ground electrode near the grounding system to artificially create a loop for testing The following introduces two methods for measuring singl...

Page 17: ...resistances In this way you can easily calculate each ground resistance value because of R1 RA RB R2 RB RC R3 RC RA So RA R1 R3 R2 2 This is the ground resistance value of the grounding body RA In or...

Page 18: ...17 XIII Accessories Meter 1 pcs Test line 4 pcs Simple test line 2 pcs USB communication line 1 pcs Monitoring software CD 1 pcs Instructions warranty 1 set Instrument box 1 pcs...

Page 19: ...sed as a reason for using the product for special purposes The company is not responsible for other losses caused by use The company reserves the right to modify the contents of the user manual If the...

Reviews: