
20
2.990.999.120_en
04/2013
SP 5080
3.5
Transporting the baling press
Always use the special bearing points for loading the machine from a lorry using a forklift.
– Place the baling press on a smooth level surface at the installation site.
– Remove the packaging foil and dispose of it in a manner that is environmentally sound.
– Cut through the steel straps.
– Using a forklift, lift the baling press by approximately 10 cm and remove the wooden blocks.
– Open the inspection fl ap and remove all the items delivered with the machine from the press
chamber.
3.5.1
Transport to another application site
If only a short distance has to be covered, the baling press can be rolled to the application
site. The new installation site must have a suffi cient fl oor loading capacity and
comply with the space requirements as well as having an appropriate power socket.
Caution!
Installations on the electrical system or control cabinet may only be carried
out by a qualifi ed electrician or one of our service engineers.