5 General post-installation checks
HSD S.p.A. © - 0105h00a.fm100713
67
5 General post-installation checks
5.1
Pre start-up checks
5.1.1
Positioning of the electrospindle
5.1.2
Pneumatic circuit
The pneumatic circuit pipes must have the diameter specified in section
, and must supply dry, filtered compressed air in accordance with that indicated;
for connections, see possible labels on the product, and section
the cone cleaning air must be present during the tool change;
the progress of the tool holder cone ejection must be that specified in section
.
Check that there are no jets of compressed air, water or other liquids directed
towards the electrospindle labyrinth ( see section
).
Summary of Contents for ES327
Page 2: ......
Page 4: ...Information about the publication 4 HSD S p A H5801H0084 fm100713 ...
Page 46: ...3 Transport packing unpacking storage 46 HSD S p A 0103h03a fm100713 ...
Page 59: ...4 Installation and commissioning HSD S p A 0104h03a fm100713 59 ES331 ES332 1 2 4 3 1 2 4 3 ...
Page 66: ...4 Installation and commissioning 66 HSD S p A 0104h03a fm100713 ...
Page 112: ...9 Disposal of the product 112 HSD S p A 0109h03a fm100713 ...
Page 116: ...10 Troubleshooting 116 HSD S p A 0110h00a fm100713 ...
Page 121: ......