
4
1.2 Included in the delivery of the TPK without burner
Pre-fitted boiler with casing
The boiler is configured for connecting a pellet burner on its left or right side, or if neither of these
positions can be used, it can be connected via the cleaning access door
The boiler is fitted as standard with a manually operated cleaning mechanism for the exchanger
Cleaning shovel/ash pan and steel brush
Summary of Contents for TPK
Page 1: ...1 with or without Scandpell ...
Page 38: ...38 8 EEC declaration of conformity ...
Page 39: ...39 9 Test certificate ...
Page 40: ...40 Rev 11 100913 ...