This method initiates a controlled shutdown of applications and the OS on any active nodes before
the cartridge enters standby mode.
• If the cartridge is unresponsive, press and hold the cartridge power button for 4 seconds to initiate
a forced shutdown of any active nodes.
• If the cartridge power LED is amber, the cartridge is in standby mode and no nodes are active. No
further action is required.
set node power off force all
3.
Verify that the power is off by reviewing the status of the cartridge power LED.
For more information, see
on page 6."
Extend the chassis from the rack
Procedure
1.
Pull down the quick release levers on each side of the chassis.
WARNING:
To reduce the risk of personal injury or equipment damage, be sure that the rack is adequately
stabilized before extending a component from the rack.
2.
Extend the chassis from the rack until it locks once.
3.
Press the push tab on the rail, and then fully extend the chassis.
WARNING:
To reduce the risk of personal injury, be careful when pressing the server rail-release latches and
sliding the server into the rack. The sliding rails could pinch your fingers.
4.
After installing or maintaining the system, slide the chassis back into the rack, and then press the
chassis firmly into the rack to secure it in place.
Extend the chassis from the rack
11