13
Figure 11 Mounting and grounding positions on the 5940 2-slot switch
(1) Power supply-side mounting position
(2) Primary grounding point
(3) Auxiliary grounding point 1
(4) Network port-side mounting position
Attaching the mounting brackets and chassis rails to the chassis
1.
Align the mounting brackets with the screw holes in the chassis. Use M4 screws (provided) to
attach the mounting brackets to the chassis.
{
To install the mounting brackets at the power supply-side mounting position, see
{
To install the mounting brackets at the network port-side mounting position, see
2.
Align the chassis rails with the rail mounting holes in the chassis:
{
If the mounting brackets are in the power supply-side mounting position, align the chassis
rails with the screw holes at the front of the side panels (see
,
and
{
If the mounting brackets are in the network port-side mounting position, align the chassis
rails with the screw holes at the rear of the side panels (see
).
3.
Use M4 screws (provided) to attach the chassis rails to the chassis.
NOTE:
•
Secure the mounting brackets and chassis rails to both sides of the chassis in the same way.
•
To install the mounting brackets at the network port-side mounting position on the HPE 5940
2-slot and HPE 5940 4-slot switches, use the four screw holes nearest to the network port side.
To install the mounting brackets at the power supply-side mounting position on the HPE 5940
2-slot and HPE 5940 4-slot switches, use the four screw holes nearest to the power module side.