Server Setup
3-6
HP ProLiant DL145 Server User Guide
In addition to these supplied items, you may need any options to be installed.
Figure 3-1: Rack-mounting hardware
Table 3-1: Rack Mounting Hardware
Item Description
1
Rack rail assemblies (2)
2
Bag of screws
Installing the Server into the Rack
If you are installing the server into a telco rack, order the appropriate option kit at the
RackSolutions.com website. Follow the server specific instructions on the website to install
the rack brackets. After installing the brackets, follow the steps in this section.
WARNING: When installing the server in a telco rack, be sure that the rack frame is
adequately secured to the top and bottom of the building structure.
WARNING: Always plan the rack installation so that the heaviest item is on the bottom
of the rack. Install the heaviest item first, and continue to populate the rack from the