
4-3
Processor Options Installation
Tools Required and Preliminary Procedures
Tools Required and Preliminary Procedures
Tools Required for Installation
All parts can be accessed with these tools:
Static grounding wrist strap
No. 1 Pozidriv screwdriver
Small flat-tipped screwdriver
5mm (3/16-inch) nutdriver (RAM standoffs require this tool)
Preliminary Procedures
Perform the following steps before installing or removing accessories:
1 Exit application programs.
2 Shut down the operating system and power off the chassis. (See Chapter
3 for detailed instructions.)
3 Remove all cables connected to the board computer.
4 Set up a static-free place on which to work.
Summary of Contents for Model 745 - VME Workstation
Page 13: ...xi Preface ...
Page 18: ...xvi ...
Page 19: ...1 1 1 Product Description ...
Page 33: ...2 1 2 Connecting Cables ...
Page 56: ...2 24 Connecting Cables Printer Connections ...
Page 57: ...3 1 3 Power On Power Off ...
Page 62: ...3 6 Power On Power Off Powering On the System Figure 3 2 Front Power Switch Power Switch ...
Page 65: ...4 1 4 Processor Options Installation ...
Page 84: ...4 20 Processor Options Installation PMC Bridge Adapter and Expansion Adapter ...
Page 85: ...5 1 5 EISA Card Installation ...
Page 93: ...6 1 6 PCI Card Installation ...
Page 100: ...6 8 PCI Card Installation Hardware Installation ...
Page 101: ...7 1 7 Installing and Configuring Mass Storage Devices ...
Page 119: ...8 1 8 Using Mass Storage Devices ...
Page 154: ...8 36 Using Mass Storage Devices Ordering Information ...
Page 155: ...9 1 9 Dealing With Problems ...
Page 168: ...9 14 Dealing With Problems Configuring the HP UX Kernel ...
Page 169: ...A 1 A Safety and Regulatory Statements ...
Page 171: ...A 3 Declaration of Conformity Declaration of Conformity ...
Page 173: ...A 5 Emissions Regulations and Statements VCCI Class A ITE Taiwan BCIQ Class A ...
Page 212: ...B 32 The Boot Console Interface Displaying PIM Information ...