Summary
Follow these easy steps to install your switch. The rest of this chapter provides
details on these steps.
1.
Prepare the installation site.
Make sure that the physical environment
into which you will be installing the switch is properly prepared including
having the correct network cabling ready to connect to the switch, and
having a good location for the switch.
Please see page 2-3 for some
installation precautions.
2.
Verify that the switch passes its self test.
This is a simple process of
plugging the switch into a power source and observing that the LEDs on
the switch’s front panel show correct operation.
See page 2-6.
3.
Mount the switch.
The Series 2700 Switches can be mounted in a 19-inch
telco rack or equipment cabinet, on a wall, or on a horizontal surface.
4.
Connect power to the switch.
Once the switch is mounted, plug it in to
the nearby AC power source.
5.
Connect the network devices.
Using the appropriate network cables,
connect servers, hubs, other switches, routers, and other network devices
to the switch ports.
At this point, the switch is fully installed and your network should be up and
running. See the rest of this chapter if you need more detailed information on
any of these installation steps.
z3.book Page 2 Friday, November 1, 2002 5:40 PM
Summary of Contents for J4897A
Page 1: ...hp procurve series 2700 switches installation guide www hp com go hpprocurve ...
Page 2: ......
Page 8: ...z3 book Page vi Friday November 1 2002 5 40 PM ...
Page 16: ...z3 book Page 8 Friday November 1 2002 5 40 PM ...
Page 36: ...z3 book Page 6 Friday November 1 2002 5 40 PM ...
Page 59: ......