GPSM Int Clk Ext Clk
========== ========== ==========
GPSM 1/1 * OK ----
GPSM 1/2 * OK ----
SUCCESS: Clocks test passed.
Clocks test complete.
Success: Fabric, CAMNet, and Global Clock tests completed with no errors
Show complex status
Use this procedure to test for fabric issues when some or all partitions can’t be taken down at the same
time.
Action
Procedure
1.
Run
SHOW XFM STATUS all
to check the health and power status of the XFM modules.
2.
Run
SHOW COMPLEX STATUS
and check the
Xfabric status
entry for the status.
3.
Check
SHOW CAE —L
and check for any xfabric routing issues and fabric link failures.
Troubleshooting clock-related issues
Cause
Clocks are provided by the GPSM module and are redundant within a complex. Use the command
HR>
test clocks
to check for clock-related issues as follows:
NOTE:
This command can be run while the partitions are active.
HR> test clocks
Clocks test started...
Blade Sys Clk 0 Sys Clk 1
========== ========== ==========
Blade 1/1 OK OK
Blade 1/2 OK OK
Blade 1/3 OK OK
Blade 1/4 OK OK
Blade 1/5 OK OK
Blade 1/6 OK OK
Blade 1/7 OK OK
Blade 1/8 OK OK
GPSM Int Clk Ext Clk
========== ========== ==========
GPSM 1/1 * OK ----
GPSM 1/2 * OK ----
SUCCESS: Clocks test passed.
Clocks test complete.
Any clock failures will also be detected and reported by CAE. To obtain these failures, run
show CAE –L
,
and then use the command
show CAE –E –n
<ID>
to obtain more details for the CAE event.
Troubleshooting clock-related issues
95