Interconnect bay labels
c3000 interconnect bay
c7000 interconnect bay
Server blade signal
3 and 4
5 and 6
Mezzanine 2
3 and 4
7 and 8
3 and 4
5 and 6
Mezzanine 3
3 and 4
7 and 8
For detailed port mapping information, see the HP BladeSystem enclosure installation poster or
the HP BladeSystem enclosure setup and installation guide for your product on the HP website
(
http://www.hp.com/go/bladesystem/documentation
).
Installing the server blade into the enclosure
NOTE:
When installing additional blades into an enclosure, additional power supplies might
also be needed to meet power requirements. For more information, see the HP BladeSystem
enclosure setup and installation guide for your product on the HP website (
http://www.hp.com/
go/bladesystem/documentation
).
NOTE:
Before installing and initializing the server blade, install any server blade options, such
as an additional processor, hard drive, or mezzanine card.
1.
Remove the connector covers if they are present.
2.
Prepare the server blade for installation.
10
Installing the server blade into the enclosure