Installation Manual
CA294-03070 rev 00
page 99 of 153
Figure 80 Installing the priming rollers - outer and inner stations
1
Clamp
3
SP2 or DP2 rubber roller
2
Bearing
4
SP4 or DP4 rubber roller
13.
To install the priming rollers (Figure 80):
a.
Open the ILP feed door.
b.
Remove the outer station priming roller mount clamps.
Place them aside on a flat clean surface.
c.
Mount the SP2 rubber, and secure it with the clamps.
d.
Mount the SP4 rubber roller, and secure it with the clamps.
e.
Open the ILP top cover.
f.
Remove the inner station priming roller mount clamps.
Place them aside on a flat clean surface.
g.
Mount the DP2 rubber roller, and secure it with the clamps.
h.
Mount the DP4 rubber roller, and secure it with the clamps.