Installation Manual
CA294-03070 rev 00
page 143 of 153
5. In
the
Diagnostics
>
BID
window,
for each
BID
tab
:
a.
Set the following voltages:
Electrode
1600
Developer
500
Squeegee
900
Cleaning 250
b.
Click ON all the voltages
c.
Check the voltage readings.
They should be set value ±5%.
Performing integration and testing
1.
Build the inks.
2.
Verify that the ink flows.
3.
Verify that the second transfer pressure is correct.
4.
Install a new blanket and PIP foil.
5.
Adjust the BID pressure.
6.
Perform the first transfer pressure calibration.
7.
Verify the writing head skew.
Changing the skew may affect focus.
8.
Verify the writing head focus.
9.
Verify the accuracy of the front to back and side to side prints:
a.
Perform the natural web length calibration for duplex. See HP Indigo Service
Instruction
Calibrations
, MNU-1633-01.
b.
Perform the eye mark sensor vertical positioning. See HP Indigo Service Instruction
Calibrations
, MNU-1633-01.
c.
Perform the eye mark sensor lateral positioning. See HP Indigo Service Instruction
Calibrations
, MNU-1633-01.
NOTE:
Ensure that the eye mark sensor lateral positioning is
accomplished before performing the eye mark distance to nip
adjustment.
d.
Perform the eye mark distance to nip adjustment. See HP Indigo Service Instruction
Calibrations
, MNU-1633-01.
e.
Make sure that the substrate is centered at PE1. Print and check.
f.
Make sure that the substrate is centered at PE2. Print and check.
10.
Perform color adjustment using the paper roll supplied with the press.
If a different substrate is to be installed on the press, perform the following:
a.
Load glossy paper on the press.
b. From
the
Adjustments
menu, click
Color Adjustment & Calibration
.