Installation Manual
CA294-03070 rev 00
page 13 of 153
Heading
Step
Reference
Procedure
Notes and
check
Production
flow
64.
Organize and install network cabling, RIP
systems, HPPF units to aid production
flow.
4
th
Day
Rewinder jig
and finishing
components
65.
Install the finishing
components on page
130
Install the rewinder jig to test the press.
After testing, install finishing components
according to customers design and Site
Preparation Guide.
Turnbar
stepping plate
66.
Installing the turnbar
stepping plate on
page 130
Install turnbar stepping plate.
Transformer
67.
Install the main power
connection and
transformer on page
130
A local qualified electrician should install
and connect the transformer and electrical
mains power connections.
Initial
power-up
68.
Perform initial power up as detailed on
page 131.
Local electrician to be present at startup to
check mains power connections.
Thread web
69.
Mount a roll at unwinder and thread to
finisher according to
Configure
press
70.
Configure the press
software on page 139
Install latest version of press software with
authorization codes.
PIP and
blankets
71.
Install PIP and
blankets on page 139
Mount and install PIP and blankets on
relevant drums.
5
th
Day
72.
Testing and
calibrating the press
on page 139
Test and calibrate press:
Emergency stop tests on page 139.
Checking the web flow on page 140.
Checking the ILP priming unit on page 140.
Testing the printing engine on page 141.
In the
Diagnostics
>
Elements Ink Flow
tab perform tests
Testing printing engine voltages on page
142.
ATP
Performing integration and testing on page
143:
1.
Build the inks.
2.
Verify that the ink flows.
3.
Verify that the second transfer
pressure is correct.
4.
Install a new blanket and PIP foil.
5.
Adjust the BID pressure.
6.
Perform the first transfer pressure
calibration.
7.
Verify the writing head skew.
Changing the skew may affect focus.