22
Verifying the installation
After you complete the installation, verify that:
•
There is enough space for heat dissipation around the switch, and the rack is stable.
•
The grounding cable is securely connected.
•
The correct power source is used.
•
The power cords are correctly connected.
•
To prevent signal ports from getting damaged by overvoltage or overcurrent caused by lightning
strikes, route interface cables only indoors.