Grounding cable
M4 screw
Front mounting
bracket
Rear mounting
bracket
Rubber feet
Console cable
AC power cord
Cage nut (user
supplied)
M6 screw (user
supplied)
Cable tie (user
supplied)
NOTE:
An AC power supply and AC power cord are supplied with the device. The specification of the AC power
cord plug varies by country. The AC power cord shown in the figure above is for illustration only.
Installation preparation checklist
Table 4
Installation preparation checklist
Item
Requirements
Result
Installation
site
Ventilation
•
There is a minimum clearance of 10 cm (3.9 in) around
the inlet and exhaust vents for heat dissipation of the
device chassis.
•
A ventilation system is available at the installation site.
Temperature
0°C to 45°C (32°F to 113°F)
Relative humidity
5% to 95% (noncondensing)
Cleanness
•
Dust concentration ≤ 3 × 10
4
particles/m
3
•
No dust on desk within three days
ESD prevention
•
The equipment and rack are well grounded.
•
The equipment room is dust-proof.
•
The humidity and temperature are at a proper level.
•
Wear an ESD-preventive wrist strap. Make sure the wrist
strap makes good skin contact and is well grounded
when installing FRUs.
•
Place the removed interface card on an antistatic
workbench, with the face upward, or put it into an
antistatic bag.
•
Touch only the edges instead of electronic components
when observing or moving a removed interface card.
6