9-4
Power-On/Power-Off
Powering Off the System
Powering Off the System
Before powering off the system, you must shutdown the operating system.
Please refer to the owner’s guide for your board computer or your operating
system for instructions on shutting down the operating system.
1
Once the operating system is shut down, press the switch on the front of the card-
cage to remove power from the entire card cage.
2
Switch the power switches on each power supply to 0 (OFF).
Summary of Contents for 748 Series
Page 10: ...x Contents ...
Page 11: ...xi Preface ...
Page 16: ...xvi ...
Page 17: ...1 1 1 Product Description ...
Page 24: ...1 8 Product Description Conversion Cables ...
Page 25: ...2 1 2 Power Budget ...
Page 26: ...2 2 Power Budget This chapter discusses the power budgeting for the Model 748 workstation ...
Page 37: ...3 1 3 VME Card Installation ...
Page 44: ...3 8 VME Card Installation Installing VME Accessory Card Hardware ...
Page 45: ...4 1 4 EISA Card Installation ...
Page 52: ...4 8 EISA Card Installation Hardware Installation ...
Page 53: ...5 1 5 PCI Card Installation ...
Page 62: ...5 10 PCI Card Installation Hardware Installation ...
Page 63: ...6 1 6 Installing and Configuring Mass Storage Devices ...
Page 76: ...6 14 Installing and Configuring Mass Storage Devices Configuring for a Hard Disk Drive ...
Page 77: ...7 1 7 Using Mass Storage Devices ...
Page 112: ...7 36 Using Mass Storage Devices Ordering Information ...
Page 113: ...8 1 8 Connecting Cables ...
Page 116: ...8 4 Connecting Cables ...
Page 117: ...9 1 9 Power On Power Off ...
Page 121: ...10 1 10 Dealing With Problems ...
Page 132: ...10 12 Dealing With Problems Dealing with Network Failures ...
Page 133: ...A 1 A Safety and Regulatory Statements ...
Page 135: ...A 3 Safety and Regulatory Statements Declaration of Conformity Declaration of Conformity ...
Page 143: ...A 11 Safety and Regulatory Statements Warnings and Cautions Warnings and Cautions ...
Page 144: ...A 12 Safety and Regulatory Statements Warnings and Cautions ...