Ground Bonding kit 54
2.
Place an M8 internal serrated lock washer and an M8 hex nut over the grounding lug on the perforated
panel or fan kit, and then tighten the washer.
3.
Place the other end of the same grounding strap over the grounding lug on the egress slot.
4.
Place an M8 internal serrated lock washer and an M8 hex nut over the grounding lug on the egress slot,
and then tighten the washer.
From the rack to a building facility:
For more information, contact your building supervisor. The following figure illustrates parts for this step.
Reference Item
1
48.26-cm (19-inch) mounting rail (the mounting hole is
located at the top or bottom of the rail)
2
M8 hex nut
3
M8 Belleville toothed washer
4
Facility ground (not included with this kit)
5
M8 x 20 bolt