Chapter 4
4-5
Troubleshooting Guide
Troubleshooting
T
roub
les
h
o
o
ti
ng
Gu
id
e
2. Make sure the libraries, Fibre Bridge, and hubs (DLT only) are
powered on and connected appropriately before powering on
workstations. If they were not connected, powered on, and configured
properly before the NT workstation was powered on, restart the
workstation (and any other on the loop, one at a time) so they can
re-discover the library.
NOTE
(DLT Only) Do not restart multiple NT workstations on a Fibre Channel
loop at the same time. Allow each workstation to complete the process
and display the NT login prompt before turning on the next computer. If
more than one workstation is powered on at the same time, only one will
locate devices on the Fibre Channel loop. This sequential process is
particularly critical when recovering from a power failure.
Summary of Contents for 2100 ER
Page 10: ...x Contents ...
Page 12: ...xii Tables ...
Page 14: ...xiv Figures ...
Page 15: ...1 1 Introduction 1 Introduction ...
Page 24: ...1 10 Chapter1 Introduction Fibre Channel Configurations ...
Page 25: ...2 1 Setting Up the Fibre Bridge 2 Setting Up the Fibre Bridge ...
Page 36: ...2 12 Chapter2 Setting Up the Fibre Bridge Installing Cables ...
Page 37: ...3 1 Operating the Fibre Bridge 3 Operating the Fibre Bridge ...
Page 51: ...4 1 Troubleshooting Guide 4 Troubleshooting Guide ...
Page 58: ...4 8 Chapter4 Troubleshooting Guide Troubleshooting ...
Page 59: ...A 1 Fibre Channel Overview A Fibre Channel Overview ...
Page 70: ...A 12 AppendixA Fibre Channel Overview Problems with Fibre Channel ...
Page 71: ...B 1 Support and Customer Service B Support and Customer Service ...
Page 82: ...B 12 AppendixB Support and Customer Service Hewlett Packard Customer Support ...
Page 83: ...C 1 Safety and Regulatory C Safety and Regulatory Information ...
Page 86: ...C 4 AppendixC Safety and Regulatory Information Chapter Overview ...