1-10
Installing the Hub
Installing Your Hub
In
st
a
lli
n
g
t
h
e
Hu
b
In
st
a
lli
n
g
t
h
e
Hu
b
In the following illustration, the top hub in the stack is connected to two end
nodes and to a second hub. Note the second hub shows Port 1 connecting to
a PC, using a straight through twisted pair cable with the port in the MDI-X
position.
AU
I/X
cv
rS
lot
10 Mbps Xcvr Port
MDI-X
(out)
(In)
MDI
Port 1 Only
1
13X
7X
19X
2X
14X
8X
20X
3X
15X
9X
21X
4X
16X
10X
22X
5X
17X
11X
23X
6X
18X
12X
24X
1
Xcvr
Reset
Console
Fault
Power
Clear
7
2
8
3
9
4
10
5
11
6
12
13
19
14
20
Act
15
21
16
22
Col
17
23
18
24
AU
I/X
cv
rS
lot
10 Mbps Xcvr Port
MDI-X
(out)
(In)
MDI
Port 1 Only
1
13X
7X
19X
2X
14X
8X
20X
3X
15X
9X
21X
4X
16X
10X
22X
5X
17X
11X
23X
6X
18X
12X
24X
1
Xcvr
Reset
Console
Fault
Power
Clear
7
2
8
3
9
4
10
5
11
6
12
13
19
14
20
Act
15
21
16
22
Col
17
23
18
24
ProCurve 10Base-T Hub 24M
ProCurve 10Base-T Hub 24M
HP J3303A
HP J3303A
Hub attached to Port 1:
switch in MDI position and
straight-through cable used.
Up to 100 meters
PC attached to Port 1: switch
in MDI-X position and
straight-through cable used.
Straight-Through
Cable from Hub to PC
,QVWDOOEN3DJH0RQGD\2FWREHU30