WARNING
Before commissioning the inverter, make sure:
• The inverter is correctly and firmly mounted;
• The inverter DC switch and external circuit breaker are disconnected;
• Check wiring according to “3.3 Electrical Wiring Connection”;
• Unused terminals must be sealed using the corresponding sealing plugs;
• Nothing is left on the top of the inverter and battery;
• Cables are routed in a safe place or protected against mechanical damage;
• Warning signs and labels are intact.
3.4.2 Commissioning
Procedure
Step 1
Wire the inverter to the AC circuit breakers.
Step 2
Rotate the DC switch to “ON”.
Step 3
Connect the DC circuit breaker between the battery and the inverter, and power on the
battery pack if it’s required.
Step 4
Establish a communication connection between the mobile phone and DTS. Configure the
parameters in Storage Toolkit and Network Config referring to “3.4.2 S-Miles Cloud APP”.
Then use the System Self-test function to detect if there is a problem with the system.
Step 5
Operate the inverter and the system will work properly.
3.4.3 Decommissioning
• Please strictly proceed as described in this section. Otherwise, it will be a danger
to life due to lethal voltages or result in irreversible damage to the inverter.
NOTICE
Procedure
Step 1
Stop the inverter from working via Hoymiles APP.
Step 2
Rotate the DC switch to the “OFF” position.
Step 3
Turn off the DC circuit breaker between the inverter and the battery.
Step 4
Turn off the AC circuit breakers of GRID, EPS and GEN.
Step 5
Wait at least 10 minutes after the LED indicators turn off to release the internal energy.
Step 6
Disconnect all the power cables.
Disconnect all the communication cables.
Remove DTS and power meter.
Step 7
Remove the inverter from the wall, and remove the bracket if necessary.
Pack the inverter and accessories.