![Howe 1000-RLE Installation & Service Manual Download Page 22](http://html1.mh-extra.com/html/howe/1000-rle/1000-rle_installation-and-service-manual_2171305022.webp)
22
Start
Up
&
Operation
Level
Control
Relay
(LC1)
This
relay
processes
the
signal
from
the
Photo
Eyes.
It
shuts
the
Ice
Flaker
off
when
the
Ice
Bin
is
full
to
prevent
damage
caused
by
ice
backing
up
into
the
evaporator
section.
Motor
Relay
(R1)
This
relay
provides
power
to
the
Drive
Motor,
the
Water
Pump,
and
the
Solenoid
Valve.
It
features
a
manual
override
button,
which
when
depressed
will
engage
the
relay
contacts,
even
when
the
relay
coil
is
not
energized.
Transformer
(T1)
This
provides
24
volt
control
power
to
the
Control
Module,
Motor
Relay,
and
indicating
lights.
Ice
Flaker
Run
Indicator
Light
This
is
lit
green
during
Normal
Operation.
Motor
Overload
Indicator
Light
This
is
lit
amber
when
Ice
Flaker
is
in
Overload
Condition.
The
Reset
Button
is
located
on
the
rear
of
the
Ice
flaker.
It
is
a
normally
open
switch,
which
resets
the
circuit
after
an
Overload
Condition.
Control
Module
(CM)
The
control
Module
features
eight
wire
terminals,
two
adjustable
dials,
and
one
indicating
light.
It
operates
in
one
of
three
main
modes:
Normal
Operation
Off
‐
Delay
Cycle
Overload
Condition
Normal
Operation
Normal
Operation
begins
when
the
Control
Module
senses
voltage
at
the
Control
Signal
(Term
3).
During
Normal
Operation
voltage
is
present
at
Ice
Flaker
Run
Switch
Leg
(Term
6)
and
the
Solenoid
Valve
Contacts
(Term
7
&
8)
are
closed.
Off
‐
Delay
Cycle
The
Off
‐
Delay
Cycle
begins
when
voltage
is
removed
from
the
Control
Signal
(Term
3).
The
length
of
the
Off
‐
Delay
Cycle
is
determined
by
the
blue
Off
‐
Delay
Setting
dial.
The
increments
are
in
minutes
with
1
being
the
lowest
possible
setting
and
30
being
the
highest.
During
the
Off
‐
Delay
Cycle
voltage
is
present
at
Ice
Flaker
Run
Switch
Leg
(Term
6)
until
the
time
setting
has
been
met.
The
Solenoid
Valve
Contacts
(Term
7
&
8)
are
opened
when
the
Off
‐
Delay
Cycle
is
initiated.
Off
‐
Delay
Setting
Under
Normal
Operation
the
Off
‐
Delay
Setting
should
be
adjusted
to
run
approximately
2
minutes
after
the
Solenoid
Valve
shuts
off
the
refrigeration
to
the
Ice
Flaker.
For
proper
adjustment,
turn
knob
counterclockwise
until
it
stops.
Then
turn
clockwise
1/8
turn
and
stop.
The
30
minute
setting
is
used
for
Cleaning
Procedure
only.
Summary of Contents for 1000-RLE
Page 6: ...6 Engineering Guidelines Figure 1 ...
Page 40: ...40 Appendix Appendix Cut View 1000 RLE ...
Page 41: ...Appendix 41 Cut View 2000 RLE 3000 RLE ...
Page 42: ...42 Appendix Assembly Drawing 1000 RLE Ice Flaker CP750 Mobile Express Ice Bin ...
Page 43: ...Appendix 43 Assembly Drawing 2000 RLE Ice Flaker CP1500 Mobile Express Ice Bin ...
Page 44: ...44 Appendix Assembly Drawing 3000 RLE Ice Flaker CP2500 Mobile Express Ice Bin ...
Page 45: ...Appendix 45 Wiring Diagram Ice Flaker ...
Page 46: ...46 Appendix Wiring Diagram 230 3 60 Air Cooled Condensing Unit supplied by Howe Corporation ...
Page 47: ...Installation Service Manual For Use with Remote Single Condensing Unit RLE Rev Date 08 2014 ...
Page 48: ...Parts List 1000 RLE Non Replaceable Parts Item No Description Part No ...
Page 51: ...Parts List 2000 RLE 3000 RLE ...