3.4.1 Overall unit dimensions
Boiler without casing and insulation
!
WARNING
The boiler must only be suspended using the four points marked as the crane suspension option in Fig. 02.
The hooks on the back of the boiler must
not
be used to suspend it.
Fig. 12
UltraGas
®
peak load boiler
Dimensions for partial load installation
Type
A
B
C
D
E
F
G
H
I
Y
K
(1550)
2244
1410
2032
1916
1780
-
-
-
-
-
-
Required minimum width of door and corridor for bringing in the boiler
The following values are the calculated minimum values
B
T =
x C
K
B
K =
x C
T
B = Boiler width
C = Maximum boiler length
T = Door width
K = Corridor width
K
T
< 150
B
L
C
Example calculation for the required corridor width, door width T = 1500
1410
UltraGas
®
(1550)
K =
x 2032 =Corridor width
≥ 1910
1500