Mounting the protection hoods
Protection hoods for the condensing unit (optional) are supplied in 3 parts,
comprising 2 side panels and 1 cover panel. They must be fitted to the unit at the
building site. The installation material is provided. Proceed as follows:
■
Drill holes in the condensing unit according to the drilling plan (8 x per protec-
tion hood, the positions are marked on the unit).
■
Mount the side panels on the condensing unit using drilling screws.
■
Apply the sealing strip to the top of the cover panel.
■
Place the cover panel in position and fit it using the enclosed M4 x 12 screws.
1145
775
Ø
2.5
405
35
0
A
Dimension
A
Front protection hood
890
Side protection hood
700
Fig. 20: Drilling plan (dimensions in mm)
Fig. 21: Mounting the protection hoods
Fig. 19: Side and front protection hoods
mounted on 2 condensing units
31
TopVent
®
TP
Transport and installation
4 218 024-en-04
Summary of Contents for TopVent TP
Page 46: ...46 4218024 en 04...
Page 47: ...47 4218024 en 04...