15
4 220 456 / 02
IMPORTANT NOTICES
Cladding sections UltraGas
®
2 (1300.1550) in installation sequence
1.1/1.2
Cable duct
2.1/2.2
Side wall bottom
3
Clamping plate
4
Electrical box
5
Rear wall bottom
6.1/6.2
Rear wall centre
7
Side wall top
8.1/8.2
Rear wall top
8.3
Blind cover for rear wall top
9
Side wall spacer
10.1/10.2
Cover plate
11
Front top
12
Siphon and condensate drain (see chapter 4.4.2)
13
Base strip on the side
14
Base strip on the front
15
Front cover
Cabling
a
Flue gas sensor (on the back of the boiler
, directly under
the return connection)
b
Neutralisation unit (if fitted)
c
W
ater pressure sensor
d
Mains cable
e
Pressure switch B18
f
Flame monitoring (ionisation)
g
Boiler temperature sensor
h
Burner wiring: 2 plug connections
Fig. 10
1. Set up climbing aid for installation:
Adjust the supplied climbing aid to the required length
using the extension piece (0a) and set it up.
2.
Mount the two cable ducts (1) on the boiler:
- Insert the cable duct part (1.2) into the cable duct
part (1.1) so that the upper holes are on top of each
other.
- Hang the cable duct (1.1/1.2) on the left or right of
the boiler in the threaded pins.
3. Installing both side walls:
- If there is a side wall support (2a, detail A), turn out-
wards to the side.
- Hang the side wall section (2.1 or 2) on the boiler
in such a way that the recesses at the top and bot-
tom are positioned over the screws (“Fig. 11”, page
- Only UltraGas
®
2 (1300.1550):
Install side wall section (2.2) (detail C):
- Position the slots in the side wall section (2.2) on
the corresponding screw heads of the side wall
section (2.1) and then fix the two sections together
by pulling down the side wall section (2.2).
- The recesses at the top and bottom of the side
wall section (2.2) must be positioned over the
screws.
-
Loosely
fasten the lower side wall (2 or 2.1/2.2)
at the fastening positions (2b) using a hexagon nut
and the corresponding washer.
4.
Mount terminal plate (3) of the electrical box:
- Position the slots in the terminal plate (3) on the cor-
responding screw heads (3a) of the lower side walls
(2) and then fix the sections together by pulling down
the terminal plate (3).
- Screw the terminal plate to the lower side walls us-
ing 4 self-tapping screws (3b).
3
3b
3b
3a
3b
3b
3a
Fig. 12
1.1
1.2
2b
2b
2b
2b
2.2
2.1
2.2
2.1
3a
3a
0a
1.1
1.2
2a
Detail A
2.1
2.2
Detail C
Detail B
Fig. 11
Summary of Contents for 51-UltraGas 2 1000
Page 65: ...65 4 220 456 02 ...