
25
SEQUENCE CHART
PREWASH
Drain and reset alternating wash valve to Position 0
X
X
X
X
X
X
X
X
X
30'' Open
Fill 2 litres static via water turbine
X
X
X
X
Verify Pressure Switch Closed
X
X
X
X
Closed
Fill 2.7 Litres & Circulate
X
X
X
X
Circulate
X
X
X
X
20''
Circulate Alternating Valve Position 1 &
Verify Pressure Sensor Closed
X
X 18'
Circulate Alternating Valve Position 1 &
Verify Pressure Sensor Closed
X
6'
Circulate Alternating Valve Position 1 &
Verify Pressure Sensor Closed
X
X
5'
Circulate & Turbidity Sensor Reading
X
Circulate & Heat Alternating Valve Position 2
& Verify Pressure Sensor Closed
X40°C
X
Drain
X
X
X
X
60''
Drain and reset alternating wash valve to Position 0
X
X
X
X
15'' Open
Fill 2 litres static via water turbine
X
Verify Pressure Switch Closed
X
Fill 2 Litres via water turbine & Circulate
X
Fill further 2 Litres if Pressure Switch is open
maximum 2 minutes
X
X 120''
Circulate & Turbidity Sensor Reading
X
Circulate Alternating Valve Position 1 &
Verify Pressure Sensor Closed
X
X
3'
Drain
X
60''
Drain and reset alternating wash valve to Position 0
X
15''
WASH
Fill 2 litres static via water turbine
X
X
X
X
X
X
X
Verify Pressure Switch Closed
X
X
X
X
X
X
X
Closed
Fill 2 Litres via water turbine
X
X
X
X
X
X
X
Fill further 2 Litres if Pressure Switch is open
maximum 2 minutes
X
X
X
X
X
X
X
120'' Closed
Regenerate & Circulate
X
X
60''
Detergent & Circulate
X
X
X
60''
Circulate & Turbidity Sensor Reading
X
Detergent & Circulate
X
X
X
X
60''
Heat & Circulate Alternating Valve Position 1
X42°C X42°C
X51°C
Circulate in Alternating Valve Position 2
X
5'
Circulate & Heat Alternating Valve Position 2
& Verify Pressure Sensor Closed
X63°C X48°C X52°C
X48°C
X
Circulate Alternating Valve Position 2 &
Verify Pressure Sensor Closed
X
X
X
20'
Circulate Alternating Valve Position 2 &
Verify Pressure Sensor Closed
X
X
6'
Circulate Alternating Valve Position 2 &
Verify Pressure Sensor Closed
X
X
10'
Drain
X
X
X
X
X
X
60''
Drain and reset alternating wash valve to Position 0
X
X
X
X
X
X
15'' Open
Fill 1 Litre
X
X
X
Drain
X
X
30'' Open
Fill 1 Litre
X
X
Drain
X
X
X
30'' Open
COLD RINSE
Fill 2 litres static via water turbine
X
X
X
X
X
Verify Pressure Switch Closed
X
X
X
X
X
Closed
Fill 2 Litres via water turbine & Circulate
X
X
X
X
X
Fill further 2 Litres if Pressure Switch is open
maximum 2 minutes
X
X
X
X
X
120'' Closed
In
ten
s
ive
Ec
o
No
rmal
Fast
P
re-Wash
Crystal
S
p
ecial
P
ressure Sensor
Wash
Ti
m
e
P
ressure Switch
Selected
No
rmal
Au
to
Du
o
Guest
Dr
yin
g