Disassembling and moving
Please check if any damage on the carton before open.
Then follow below steps to remove UPS from the carton and the pallet.
Remove the cartons and foam.
Remove the nuts showed in the figure.
Preparing two cables. The length of two cables is about 3 meters and the bearing should
be at least 1.5 tons. Fix the UPS with cables. Use the hoist to lift up the UPS and place it
on the ground.