![Hoshizaki KM-40B Service Manual Download Page 54](http://html.mh-extra.com/html/hoshizaki/km-40b/km-40b_service-manual_2164649054.webp)
50
7) Braze the new Hot Gas Valve with nitrogen gas flowing at a pressure of 0.2 - 0.3 bar.
WARNING
Always protect the valve body by using a damp cloth to prevent the valve
from overheating. Do not braze with the valve body exceeding 135°C.
8) Install the new Drier (see “V. 4. DRIER”).
9) Check for leaks using nitrogen gas (10 bar) and soap bubbles.
10) Evacuate the system and charge it with refrigerant (see “V. 1. [c] EVACUATION AND
RECHARGE”).
11) Attach the Solenoid Coil to the valve body, and secure it with the screw.
12) Connect the lead wires.
13) Refit the panels in their correct positions.
14) Plug in the icemaker or connect the power source.
Summary of Contents for KM-40B
Page 1: ...KM 40B KM 55B KM 80B SELF CONTAINED CRESCENT CUBER SERVICE MANUAL F120 1011 073117 ...
Page 5: ...1 I SPECIFICATIONS 1 DIMENSIONS SPECIFICATIONS a KM 40B Europe ...
Page 6: ...2 b KM 40B Singapore ...
Page 7: ...3 c KM 40B Australia New Zealand ...
Page 8: ...4 d KM 40B Philippines ...
Page 9: ...5 e KM 55B Europe ...
Page 10: ...6 f KM 55B Singapore ...
Page 11: ...7 g KM 55B Australia New Zealand ...
Page 12: ...8 h KM 55B Philippines ...
Page 13: ...9 i KM 80B Europe ...
Page 14: ...10 j KM 80B Singapore ...
Page 15: ...11 k KM 80B Australia New Zealand ...
Page 16: ...12 l KM 80B Philippines ...
Page 22: ...18 ...
Page 37: ...33 2 WIRING DIAGRAM a KM 40B Philippines b KM 40B Except Philippines KM 55B ...
Page 38: ...34 c KM 80B ...