5
DIMENSIONS
Please refer to the dimensions of your own appliance.
IMPLEMENTATION AND INSTALLATION
The products are always packed with cardboard and shipped on pallets.
In case of damage or missing parts u
pon delivery, follow the instructions given in the chapter ‘GENERAL
INFORMATION UPON D
ELIVERY’.
All setting up and starting operations are to be carried out by skilled staff.
Remove the packing with care in order not to dent the
counter surfaces.
WARNING
: keep the packing components (plastic bags, polystyrene foam, nails, etc) away from children
since they can be very dangerous.
Use a fork truck to lift the counter and move it to the installation site, paying
attention not to unbalance the load.