HORNE T105A Installation, Operating And Maintenance Instructions Download Page 3

Horne Engineering Ltd 

Issue 7, November 2018 

 

 

 

 

3

 

Fig 1 

Fig 2 

4)  Mark out the 4 Support Holes 

Ensure  that  the  enclosure  is 
hanging true and then mark out the 
holes  for  the  2  upper  support 
screws.  Remove the bottom cover 
of  the  pre-plumbed  enclosure  and 
mark  out  the  2  lower  support 
screws (See Fig 3). 

 

 

5)  Drill Support Holes 

Carefully remove the pre-plumbed 
enclosure from the temporary 
support screw and, being careful 
not to scratch the enclosure or its 
covers, lay it down where it will not 
be damaged.  Drill the 4 holes and 
install the wall plugs. 
 

6)  Attach  the  Pre-Plumbed  Enclosure 

to the Wall 

Carefully  re-hang  the  pre-plumbed 
enclosure  on  the  temporary  screw. 
Put the four supplied screw bushes 
in  the  mounting  holes  in  the  panel 
and  then  attach  the  panel  firmly  to 
the  wall  by  the  four  supplied 
stainless  steel  screws.    A  bead  of 
silicon  mastic  can  be  used,  if 
required, to cover any gaps behind 
the  panel  on  uneven  walls.  Do  not 
mastic  the  lower  End  Cap  to  the 
wall.  See Fig 4. 

 

Fig 3 

 

 
 
 

 

 

 

Summary of Contents for T105A

Page 1: ...fed by supplies with differing pressures use the following to determine whether a pressure reducing valve PRV is required on the side with the higher pressure Note that output flow rate is always det...

Page 2: ...head shown p13 Bottom of panel should be 1 1 metres from finished floor level 1 Position the Pre Plumbed Enclosure Identify a suitable position for the Enclosure and mark a line on the wall level wit...

Page 3: ...screw and being careful not to scratch the enclosure or its covers lay it down where it will not be damaged Drill the 4 holes and install the wall plugs 6 Attach the Pre Plumbed Enclosure to the Wall...

Page 4: ...rk in accordance with Water Bylaws 2000 Scotland and BS 6700 1997 England Wales The use of a Horne flushing kit is strongly recommended because this connects directly to the water inlets to the mixing...

Page 5: ...before the pre plumbed enclosure is attached to the wall Accordingly point 7 on the attached installation instructions Connect the Supply Pipes should be performed before point 6 Attach the Pre Plumbe...

Page 6: ...ve the set temperature In either case there is no scalding risk If the temperature rises above this then it is likely that there is contamination in the TSV1 3 that is preventing it from shutting off...

Page 7: ...2 5 Nm Ensure the on off assembly is torqued down to 25 Nm 34 lbft to prevent the user from inadvertently unscrewing the assembly during flow control Do not over tighten the assembly The Check Valves...

Page 8: ...efore performing this test If mixed water continues to flow and is coming from the showerhead at a temperature of more than 2 C above the maximum mixed water temperature setting then the TSV1 3 is due...

Page 9: ...fter commissioning If small adjustments 1 to 2 K are required then check the strainers for cleanliness make sure the isolating valves are fully open and verify the check valves are operating correctly...

Page 10: ...Horne Engineering Ltd Issue 7 November 2018 10...

Page 11: ...Horne Engineering Ltd Issue 7 November 2018 11...

Page 12: ...Horne Engineering Ltd Issue 7 November 2018 12...

Page 13: ...Horne Engineering Ltd Issue 7 November 2018 13...

Page 14: ...Max Mixed Water Temp during CW Isolation test C Mixed Water Temp on restoration of CW Supply C Note MWT should return within 2 degrees of set temp and be no greater than 43C after this test Comments...

Page 15: ...y C Note MWT should return within 2 degrees of set temp and be no greater than 43C after this test Comments Recommended Date of Next In Service Test In Service Testing Record Establishment Location of...

Page 16: ...ng Ltd Issue 7 November 2018 16 Brochure Ref L 189 T10XA Horne Engineering Ltd PO Box 7 Rankine Street Johnstone SCOTLAND PA5 8BD Tel 44 0 1505 321455 Fax 44 0 1505 336287 Email Technical horne co uk...

Reviews: