
WI-0055: SQ2 User Manual
Version 1.0
6
Horizon Signal
SQ2 User Manual
SQ2 Setup Procedures
1. Open the SQ2 Transport Trailer
2. Remove locking clips from floor.
3. Use handles to remove cart from trailer.
4. Position SQ2 cart as necessary.
5. Install optional outriggers as needed.
6. Install optional solar panel as necessary.
7. Raise cart to the operating position.
8. Power on the SQ2 controller.
9. Repeat this process for all four carts.
Photo Guide
Step 4
Step 8
Step 7
Step 6
Step 5
Step 3
Step 2
Step 1
Step 9
Summary of Contents for SQ2
Page 1: ...WI 0055 SQ2 User Manual Version 1 0 1 Horizon Signal SQ2 User Manual User Manual...
Page 5: ...WI 0055 SQ2 User Manual Version 1 0 5 Horizon Signal SQ2 User Manual...
Page 7: ...WI 0055 SQ2 User Manual Version 1 0 7 Horizon Signal SQ2 User Manual...
Page 20: ...WI 0055 SQ2 User Manual Version 1 0 20 Horizon Signal SQ2 User Manual...
Page 21: ...WI 0055 SQ2 User Manual Version 1 0 21 Horizon Signal SQ2 User Manual...
Page 22: ...WI 0055 SQ2 User Manual Version 1 0 22 Horizon Signal SQ2 User Manual SQ2 Deployed Dimensions...
Page 25: ...WI 0055 SQ2 User Manual Version 1 0 25 Horizon Signal SQ2 User Manual...
Page 27: ...WI 0055 SQ2 User Manual Version 1 0 27 Horizon Signal SQ2 User Manual...